IAC logo
IAC Assessment: TN0670
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0670
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Uniforms
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 100,000
Annual Production 488,000 Pieces
Production Hrs. Annual 2,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,267 788,980 kWh $0.03
Electricity Demand $13,515 3,908 kW-months/year $3.46
Electricity Fees $6,329 - $ -
Natural Gas $42,738 6,593 MMBtu $6.48
TOTAL ENERGY COSTS $85,849
RECOMMENDED SAVINGS* $59,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,164
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$30,906
Cost:
$3,200
- - - - - - $30,906 261,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,906
261,000
lb
-
-
$
02: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$20,663
Cost:
$16,000
- - - - - - - - $20,663 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$20,663
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,283
Cost:
$3,000
$5,363 98,183 - - $920 142 - - - - $5,363
98,183
kWh
-
-
kW-months/year
$920
142
MMBtu
-
-
lb
-
-
$
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$640
Cost:
$1,250
$640 11,723 - - - - - - - - $640
11,723
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$493
Cost:
$625
- - - - - - $493 9,250 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$493
9,250
lb
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$342
Cost:
-
$242 4,396 $100 2 - - - - - - $242
4,396
kWh
$100
2
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$335
Cost:
-
$335 12,309 - - - - - - - - $335
12,309
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$59,662
Cost:
$24,075
$6,580 126,611 $100 2 $920 142 $31,399 270,250 $20,663 - $6,580
126,611
kWh
$100
2
kW-months/year
$920
142
MMBtu
$31,399
270,250
lb
$20,663
-
$
TOTAL IMPLEMENTED Savings:
$38,164
Cost:
$7,450
$6,338 122,215 - - $920 142 $30,906 261,000 - - $6,338
122,215
kWh
-
-
kW-months/year
$920
142
MMBtu
$30,906
261,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material