IAC logo
IAC Assessment: TN0674
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0674
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Hardwood Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 1,010,000
Annual Production 18,000 Thousand Feet
Production Hrs. Annual 4,275
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,482 1,913,834 kWh $0.08
Electricity Demand $50,674 6,351 kW-months/year $7.98
Electricity Fees $12,341 - $ -
TOTAL ENERGY COSTS $222,497
RECOMMENDED SAVINGS* $764,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,870
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$466,160
Cost:
$455,420
$(-29,230) (-885,698) $(-57,320) (-5,592) $(-361,020) - - - - - $913,730 - $(-29,230)
(-885,698)
kWh
$(-57,320)
(-5,592)
kW-months/year
$(-361,020)
-
lb
-
-
$
-
-
$
$913,730
-
$
02: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$249,860
Cost:
$667,440
$(-21,280) (-644,783) $(-23,860) (-2,328) - - $256,000 - $39,000 - - - $(-21,280)
(-644,783)
kWh
$(-23,860)
(-2,328)
kW-months/year
-
-
lb
$256,000
-
$
$39,000
-
$
-
-
$
03: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$42,930
Cost:
$25,500
- - - - - - - - $42,930 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$42,930
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,490
Cost:
$750
$4,120 124,853 $370 36 - - - - - - - - $4,120
124,853
kWh
$370
36
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,380
Cost:
$500
$400 12,016 $980 96 - - - - - - - - $400
12,016
kWh
$980
96
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$764,820
Cost:
$1,149,610
$(-45,990) (-1,393,612) $(-79,830) (-7,788) $(-361,020) - $256,000 - $81,930 - $913,730 - $(-45,990)
(-1,393,612)
kWh
$(-79,830)
(-7,788)
kW-months/year
$(-361,020)
-
lb
$256,000
-
$
$81,930
-
$
$913,730
-
$
TOTAL IMPLEMENTED Savings:
$5,870
Cost:
$1,250
$4,520 136,869 $1,350 132 - - - - - - - - $4,520
136,869
kWh
$1,350
132
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product By-product Production