IAC logo
IAC Assessment: TN0675
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0675
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Truck Cabs
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 164
Plant Area (Sq.Ft.) 115,000
Annual Production 13,595 Pieces
Production Hrs. Annual 3,920
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $342,552 6,228,020 kWh $0.06
Electricity Demand $61,017 18,046 kW-months/year $3.38
Electricity Fees $9,318 - $ -
Natural Gas $166,689 38,717 MMBtu $4.31
TOTAL ENERGY COSTS $657,685
RECOMMENDED SAVINGS* $134,068 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,764
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Primary Product Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Primary Product
$ kWh $ MMBtu $ Tgal $ lb $ lb $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$72,335
Cost:
$1,075
$385 8,206 - - - - - - - - $71,950 - $385
8,206
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
$71,950
-
$
02: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$20,125
Cost:
$25,600
- - - - - - - - $20,125 24,000 - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$20,125
24,000
lb
-
-
$
03: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$18,800
Cost:
$16,000
- - - - - - - - - - $18,800 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
$18,800
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,789
Cost:
$16,600
$3,845 67,409 $5,944 1,382 - - - - - - - - $3,845
67,409
kWh
$5,944
1,382
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$8,725
Cost:
$6,000
- - - - - - $8,725 - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$8,725
-
lb
-
-
lb
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,450
Cost:
$3,300
- - - - $2,450 - - - - - - - -
-
kWh
-
-
MMBtu
$2,450
-
Tgal
-
-
lb
-
-
lb
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,844
Cost:
-
$1,844 542,497 - - - - - - - - - - $1,844
542,497
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$134,068
Cost:
$68,575
$6,074 618,112 $5,944 1,382 $2,450 - $8,725 - $20,125 24,000 $90,750 - $6,074
618,112
kWh
$5,944
1,382
MMBtu
$2,450
-
Tgal
$8,725
-
lb
$20,125
24,000
lb
$90,750
-
$
TOTAL IMPLEMENTED Savings:
$39,764
Cost:
$41,900
$3,845 67,409 $5,944 1,382 $2,450 - $8,725 - - - $18,800 - $3,845
67,409
kWh
$5,944
1,382
MMBtu
$2,450
-
Tgal
$8,725
-
lb
-
-
lb
$18,800
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ lb $ $
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Primary Product Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Primary Product