Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 2000 |
Principal Product | Truck Cabs |
NAICS | n/a |
SIC | 3713 - Truck And Bus Bodies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 164 |
Plant Area (Sq.Ft.) | 115,000 |
Annual Production | 13,595 Pieces |
Production Hrs. Annual | 3,920 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $342,552 | 6,228,020 | kWh | $0.06 |
Electricity Demand | $61,017 | 18,046 | kW-months/year | $3.38 |
Electricity Fees | $9,318 | - | $ | - |
Natural Gas | $166,689 | 38,717 | MMBtu | $4.31 |
TOTAL ENERGY COSTS | $657,685 | |||
RECOMMENDED SAVINGS* | $134,068 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $39,764 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $72,335 Cost: $1,075 |
$385 | 8,206 | - | - | - | - | - | - | - | - | $71,950 | - |
$385 8,206 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
$71,950 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $20,125 Cost: $25,600 |
- | - | - | - | - | - | - | - | $20,125 | 24,000 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$20,125 24,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $18,800 Cost: $16,000 |
- | - | - | - | - | - | - | - | - | - | $18,800 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
$18,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $9,789 Cost: $16,600 |
$3,845 | 67,409 | $5,944 | 1,382 | - | - | - | - | - | - | - | - |
$3,845 67,409 kWh |
$5,944 1,382 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $8,725 Cost: $6,000 |
- | - | - | - | - | - | $8,725 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$8,725 - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $2,450 Cost: $3,300 |
- | - | - | - | $2,450 | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$2,450 - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,844 Cost: - |
$1,844 | 542,497 | - | - | - | - | - | - | - | - | - | - |
$1,844 542,497 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $134,068 Cost: $68,575 |
$6,074 | 618,112 | $5,944 | 1,382 | $2,450 | - | $8,725 | - | $20,125 | 24,000 | $90,750 | - | $6,074 618,112 kWh |
$5,944 1,382 MMBtu |
$2,450 - Tgal |
$8,725 - lb |
$20,125 24,000 lb |
$90,750 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $39,764 Cost: $41,900 |
$3,845 | 67,409 | $5,944 | 1,382 | $2,450 | - | $8,725 | - | - | - | $18,800 | - | $3,845 67,409 kWh |
$5,944 1,382 MMBtu |
$2,450 - Tgal |
$8,725 - lb |
- - lb |
$18,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product |