IAC Assessment: TN0676
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0676
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Extruded plastic film
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 160,000
Annual Production 63,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $688,378 18,538,101 kWh $0.04
Electricity Demand $263,532 28,269 kW-months/year $9.32
TOTAL ENERGY COSTS $951,910
RECOMMENDED SAVINGS* $164,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,891
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$105,000
Cost:
$94,080
- - - - - - $105,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$105,000
-
$
02: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$37,314
Cost:
$28,050
$34,200 777,257 - - - - $3,114 - $34,200
777,257
kWh
-
-
kW-months/year
-
-
lb
$3,114
-
$
03: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$6,275
Cost:
$18,200
$6,275 119,578 - - - - - - $6,275
119,578
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,144
Cost:
$1,200
- - - - $6,144 45,000 - - -
-
kWh
-
-
kW-months/year
$6,144
45,000
lb
-
-
$
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$4,496
Cost:
$12,200
- - - - $4,290 572,000 $206 - -
-
kWh
-
-
kW-months/year
$4,290
572,000
lb
$206
-
$
06: 2.6215 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON Savings:
$3,095
Cost:
$6,250
$3,095 70,340 - - - - - - $3,095
70,340
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,025
Cost:
$175
$709 16,120 $316 2 - - - - $709
16,120
kWh
$316
2
kW-months/year
-
-
lb
-
-
$
08: 3.4155 METER WASTE WATER Savings:
$928
Cost:
$2,300
- - - - - - $928 - -
-
kWh
-
-
kW-months/year
-
-
lb
$928
-
$
TOTAL RECOMMENDED Savings:
$164,277
Cost:
$162,455
$44,279 983,295 $316 2 $10,434 617,000 $109,248 - $44,279
983,295
kWh
$316
2
kW-months/year
$10,434
617,000
lb
$109,248
-
$
TOTAL IMPLEMENTED Savings:
$14,891
Cost:
$36,825
$10,079 206,038 $316 2 $4,290 572,000 $206 - $10,079
206,038
kWh
$316
2
kW-months/year
$4,290
572,000
lb
$206
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes