IAC logo
IAC Assessment: TN0681
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0681
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Hot dip metal galvanizing
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 16,628
Annual Production 52,000,000 Pounds
Production Hrs. Annual 6,552
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,114 783,705 kWh $0.04
Electricity Demand $8,652 1,460 kW-months/year $5.93
Electricity Fees $731 - $ -
Natural Gas $154,526 54,517 MMBtu $2.83
LPG $6,631 961 MMBtu $6.90
TOTAL ENERGY COSTS $246,629
RECOMMENDED SAVINGS* $76,318 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,883
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Other Liquid (haz) Personnel Changes Administrative Changes Primary Product
$ kWh $ gal $ $ $ $ $ $
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$32,683
Cost:
$83,500
- - $25,970 3,023 $1,200 - $5,513 - - - -
-
kWh
$25,970
3,023
gal
$1,200
-
$
$5,513
-
$
-
-
$
02: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$20,000
Cost:
$16,083
- - - - - - $20,000 - - - -
-
kWh
-
-
gal
-
-
$
$20,000
-
$
-
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$11,200
Cost:
$23,000
- - - - - - - - $11,200 - -
-
kWh
-
-
gal
-
-
$
-
-
$
$11,200
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$6,170
Cost:
$250
$6,170 69,168 - - - - - - - - $6,170
69,168
kWh
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,865
Cost:
$9,000
$3,865 400,059 - - - - - - - - $3,865
400,059
kWh
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$2,400
Cost:
$1,700
$2,400 248,242 - - - - - - - - $2,400
248,242
kWh
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$76,318
Cost:
$133,533
$12,435 717,469 $25,970 3,023 $1,200 - $25,513 - $11,200 - $12,435
717,469
kWh
$25,970
3,023
gal
$1,200
-
$
$25,513
-
$
$11,200
-
$
TOTAL IMPLEMENTED Savings:
$63,883
Cost:
$122,583
- - $25,970 3,023 $1,200 - $25,513 - $11,200 - -
-
kWh
$25,970
3,023
gal
$1,200
-
$
$25,513
-
$
$11,200
-
$
Savings
Cost
$ kWh $ gal $ $ $ $ $ $
Electricity Usage Other Liquid (haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Other Liquid (haz) Personnel Changes Administrative Changes Primary Product