IAC logo
IAC Assessment: TN0690
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0690
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Cast aluminum wheels
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 300,000
Annual Production 1,275,000 Pieces
Production Hrs. Annual 7,344
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,210,739 40,669,696 kWh $0.03
Electricity Demand $330,094 61,242 kW-months/year $5.39
Natural Gas $1,442,080 480,040 MMBtu $3.00
TOTAL ENERGY COSTS $7,090,755
RECOMMENDED SAVINGS* $700,738 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $258,893
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$272,160
Cost:
$169,485
- - $272,160 72,860 - - - - - - - - -
-
kWh
$272,160
72,860
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$164,990
Cost:
$183,505
$(-2,085) 54,807 - - - - - - $167,075 - - - $(-2,085)
54,807
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$167,075
-
$
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$93,903
Cost:
$3,930
$18,453 485,053 $175,695 58,565 - - - - $(-100,245) - - - $18,453
485,053
kWh
$175,695
58,565
MMBtu
-
-
Tgal
-
-
lb
$(-100,245)
-
$
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$72,100
Cost:
-
- - $72,100 - - - - - - - - - -
-
kWh
$72,100
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$29,370
Cost:
$9,805
- - $29,370 9,790 - - - - - - - - -
-
kWh
$29,370
9,790
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$32,000
Cost:
$13,020
- - - - $32,000 5,100,000 - - - - - - -
-
kWh
-
-
MMBtu
$32,000
5,100,000
Tgal
-
-
lb
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$17,200
Cost:
$5,810
- - - - - - $16,000 800,000 - - $1,200 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$16,000
800,000
lb
-
-
$
$1,200
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,310
Cost:
$33,160
- - $14,310 4,770 - - - - - - - - -
-
kWh
$14,310
4,770
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
09: 2.2514 COVER OPEN TANKS Savings:
$4,705
Cost:
$2,280
- - $4,705 1,568 - - - - - - - - -
-
kWh
$4,705
1,568
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$700,738
Cost:
$420,995
$16,368 539,860 $568,340 147,553 $32,000 5,100,000 $16,000 800,000 $66,830 - $1,200 - $16,368
539,860
kWh
$568,340
147,553
MMBtu
$32,000
5,100,000
Tgal
$16,000
800,000
lb
$66,830
-
$
$1,200
-
$
TOTAL IMPLEMENTED Savings:
$258,893
Cost:
$187,435
$16,368 539,860 $175,695 58,565 - - - - $66,830 - - - $16,368
539,860
kWh
$175,695
58,565
MMBtu
-
-
Tgal
-
-
lb
$66,830
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes