IAC Assessment: TR0061
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TR0061
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2024
Principal Product Stamped metal parts
NAICS 332111 - Iron and Steel Forging
SIC 3462 - Iron And Steel Forgings
Sales $50,000,000-$100,000,000
# of Employees 73
Plant Area (Sq.Ft.) 344,124
Annual Production 60,000,000 Pieces
Production Hrs. Annual 5,040
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,392 1,503,936 kWh $0.06
Electricity Demand $57,063 4,890 kW-months/year $11.67
Electricity Fees $4,492 - $ -
TOTAL ENERGY COSTS $152,947
RECOMMENDED SAVINGS* $150,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$121,083
Cost:
$551,388
$91,560 1,506,670 $29,522 2,530 - - $91,560
1,506,670
kWh
$29,522
2,530
kW-months/year
-
-
$
02: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$9,288
Cost:
$17,929
$6,374 104,888 $2,914 250 - - $6,374
104,888
kWh
$2,914
250
kW-months/year
-
-
$
03: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$2,219
Cost:
$4,350
$2,219 36,508 - - - - $2,219
36,508
kWh
-
-
kW-months/year
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$16,588
Cost:
$55,200
$13,133 216,116 $3,455 296 - - $13,133
216,116
kWh
$3,455
296
kW-months/year
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,297
Cost:
$728
$708 8,808 $564 25 $24 - $708
8,808
kWh
$564
25
kW-months/year
$24
-
$
TOTAL RECOMMENDED Savings:
$150,474
Cost:
$629,595
$113,994 1,872,990 $36,456 3,101 $24 - $113,994
1,872,990
kWh
$36,456
3,101
kW-months/year
$24
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees