IAC Assessment: TT0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2007
Principal Product Steering Gears
NAICS 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 230,525
Annual Production 2,000,000 Pieces
Production Hrs. Annual 8,640
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,023,195 41,014,800 kWh $0.05
Natural Gas $69,057 4,639 MMBtu $14.89
TOTAL ENERGY COSTS $2,270,901
RECOMMENDED SAVINGS* $239,315 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $225,415
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Fees Natural Gas Administrative Changes
$ kWh $ $ $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$541
Cost:
$360
$541 9,008 - - - - - - $541
9,008
kWh
-
-
$
-
-
MMBtu
-
-
$
02: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$21,551
Cost:
$110
- - - - - - $21,551 - -
-
kWh
-
-
$
-
-
MMBtu
$21,551
-
$
03: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$13,359
Cost:
$1,200
- - - - $13,359 - - - -
-
kWh
-
-
$
$13,359
-
MMBtu
-
-
$
04: 2.3522 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES Savings:
$44,581
Cost:
$51,000
$44,581 891,626 - - - - - - $44,581
891,626
kWh
-
-
$
-
-
MMBtu
-
-
$
05: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$159,283
Cost:
$2,912
- - $159,283 - - - - - -
-
kWh
$159,283
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$239,315
Cost:
$55,582
$45,122 900,634 $159,283 - $13,359 - $21,551 - $45,122
900,634
kWh
$159,283
-
$
$13,359
-
MMBtu
$21,551
-
$
TOTAL IMPLEMENTED Savings:
$225,415
Cost:
$54,022
$44,581 891,626 $159,283 - - - $21,551 - $44,581
891,626
kWh
$159,283
-
$
-
-
MMBtu
$21,551
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Fees Natural Gas Administrative Changes