IAC logo
IAC Assessment: TT0016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2008
Principal Product Steel Caskets
NAICS 339995 - Burial Casket Manufacturing
SIC 3995 - Burial Caskets
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 500,000
Annual Production 300,000 Pieces
Production Hrs. Annual 5,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $691,892 20,139,222 kWh $0.03
Electricity Demand $320,911 36,395 kW-months/year $8.82
Electricity Fees $100,000 - $ -
Natural Gas $1,020,796 96,766 MMBtu $10.55
TOTAL ENERGY COSTS $2,133,599
RECOMMENDED SAVINGS* $63,882 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,953
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,400
Cost:
$50,000
- - $17,400 - - - -
-
kWh
$17,400
-
$
-
-
MMBtu
02: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$5,929
Cost:
$1,500
$5,929 147,670 - - - - $5,929
147,670
kWh
-
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,553
Cost:
$42,900
$21,553 640,886 - - - - $21,553
640,886
kWh
-
-
$
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$19,000
Cost:
$19,750
- - - - $19,000 1,870 -
-
kWh
-
-
$
$19,000
1,870
MMBtu
TOTAL RECOMMENDED Savings:
$63,882
Cost:
$114,150
$27,482 788,556 $17,400 - $19,000 1,870 $27,482
788,556
kWh
$17,400
-
$
$19,000
1,870
MMBtu
TOTAL IMPLEMENTED Savings:
$38,953
Cost:
$92,900
$21,553 640,886 $17,400 - - - $21,553
640,886
kWh
$17,400
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu