IAC Assessment: TT0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2009
Principal Product Vacuum Cleaning Equipment
NAICS 335210 - Small Electrical Appliance Manufacturing
SIC 3635 - Household Vacuum Cleaners
Sales <$500,000
# of Employees 370
Plant Area (Sq.Ft.) 310,000
Annual Production 8,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $723,421 12,178,800 kWh $0.06
Electricity Demand $91,793 21,557 kW-months/year $4.26
Electricity Fees $12,228 - $ -
Natural Gas $96,133 7,214 MMBtu $13.33
TOTAL ENERGY COSTS $955,259
RECOMMENDED SAVINGS* $55,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,300
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$20,000
Cost:
$47,500
$15,780 228,689 $4,220 313 - - $15,780
228,689
kWh
$4,220
313
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,800
Cost:
$2,500
$4,800 69,293 - - - - $4,800
69,293
kWh
-
-
kW-months/year
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,250
Cost:
$4,800
- - - - $3,250 - -
-
kWh
-
-
kW-months/year
$3,250
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,900
Cost:
$800
$2,900 32,675 - - - - $2,900
32,675
kWh
-
-
kW-months/year
-
-
$
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$13,300
Cost:
$20,000
$13,300 224,000 - - - - $13,300
224,000
kWh
-
-
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,950
Cost:
$5,000
$3,700 62,160 $1,250 88 - - $3,700
62,160
kWh
$1,250
88
kW-months/year
-
-
$
07: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$4,000
Cost:
-
$3,000 50,400 $1,000 72 - - $3,000
50,400
kWh
$1,000
72
kW-months/year
-
-
$
08: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$2,400
Cost:
-
$1,800 30,240 $600 43 - - $1,800
30,240
kWh
$600
43
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$55,600
Cost:
$80,600
$45,280 697,457 $7,070 516 $3,250 - $45,280
697,457
kWh
$7,070
516
kW-months/year
$3,250
-
$
TOTAL IMPLEMENTED Savings:
$9,300
Cost:
$800
$7,700 113,315 $1,600 115 - - $7,700
113,315
kWh
$1,600
115
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes