Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2011 |
Principal Product | Valves |
NAICS | 332912 - Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3492 - Fluid Power Valves & Hose Fittings |
Sales | $100,000,000-$500,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 290,000 |
Annual Production | 660,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $405,359 | 14,425,488 | kWh | $0.03 |
Electricity Demand | $227,670 | 29,482 | kW-months/year | $7.72 |
Electricity Fees | $396,484 | - | $ | - |
Natural Gas | $55,030 | 6,025 | MMBtu | $9.13 |
TOTAL ENERGY COSTS | $1,127,144 | |||
RECOMMENDED SAVINGS* | $32,186 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $900 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Electricity Usage | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $339 Cost: - |
$339 | 12,093 | - | - |
$339 12,093 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $6,712 Cost: $4,800 |
$6,712 | 238,880 | - | - |
$6,712 238,880 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES |
Savings: $1,238 Cost: - |
$1,238 | 44,044 | - | - |
$1,238 44,044 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $900 Cost: $1,050 |
- | - | $900 | 500,000 |
- - kWh |
$900 500,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $8,057 Cost: $30,500 |
$8,057 | 287,000 | - | - |
$8,057 287,000 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $12,516 Cost: $4,000 |
$12,516 | 445,434 | - | - |
$12,516 445,434 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $2,424 Cost: $120 |
$2,424 | 86,283 | - | - |
$2,424 86,283 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,186 Cost: $40,470 |
$31,286 | 1,113,734 | $900 | 500,000 | $31,286 1,113,734 kWh |
$900 500,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $900 Cost: $1,050 |
- | - | $900 | 500,000 | - - kWh |
$900 500,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Electricity Usage | Water Disposal |