IAC logo
IAC Assessment: TT0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2012
Principal Product Treated Wood-Railroad
NAICS 321114 - Wood Preservation
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 500,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $279,849 3,186,750 kWh $0.09
Electricity Demand $36,264 10,220 kW-months/year $3.55
Natural Gas $561,583 94,149 MMBtu $5.96
TOTAL ENERGY COSTS $915,076
RECOMMENDED SAVINGS* $382,553 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,460
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$463
Cost:
-
$463 5,144 - - $463
5,144
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,193
Cost:
$1,753
$5,193 57,700 - - $5,193
57,700
kWh
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$26,105
Cost:
$10,000
- - $26,105 4,380 -
-
kWh
$26,105
4,380
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,892
Cost:
$1,000
$1,892 21,022 - - $1,892
21,022
kWh
-
-
MMBtu
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$18,900
Cost:
$2,000
$18,900 210,300 - - $18,900
210,300
kWh
-
-
MMBtu
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$330,000
Cost:
$630,000
- - $330,000 47,041 -
-
kWh
$330,000
47,041
MMBtu
TOTAL RECOMMENDED Savings:
$382,553
Cost:
$644,753
$26,448 294,166 $356,105 51,421 $26,448
294,166
kWh
$356,105
51,421
MMBtu
TOTAL IMPLEMENTED Savings:
$28,460
Cost:
$11,000
$2,355 26,166 $26,105 4,380 $2,355
26,166
kWh
$26,105
4,380
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas