IAC logo
IAC Assessment: TT0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2014
Principal Product Bottled Water
NAICS 312112 - Bottled Water Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 377,000
Annual Production 19,000,000 Pieces
Production Hrs. Annual 6,396
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $967,251 21,554,227 kWh $0.04
Electricity Demand $550,280 41,893 kW-months/year $13.14
Electricity Fees $22,763 - $ -
Natural Gas $99,808 10,970 MMBtu $9.10
TOTAL ENERGY COSTS $1,740,816
RECOMMENDED SAVINGS* $115,888 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,882
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$107,559
Cost:
$235,000
$5,609 124,645 - - $10,250 - $91,700 10,111 $5,609
124,645
kWh
-
-
kW-months/year
$10,250
-
$
$91,700
10,111
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,620
Cost:
$2,025
$1,647 36,594 $973 74 - - - - $1,647
36,594
kWh
$973
74
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,827
Cost:
$3,000
$1,777 39,480 $1,050 80 - - - - $1,777
39,480
kWh
$1,050
80
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,882
Cost:
$3,000
$2,882 64,049 - - - - - - $2,882
64,049
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$115,888
Cost:
$243,025
$11,915 264,768 $2,023 154 $10,250 - $91,700 10,111 $11,915
264,768
kWh
$2,023
154
kW-months/year
$10,250
-
$
$91,700
10,111
MMBtu
TOTAL IMPLEMENTED Savings:
$2,882
Cost:
$3,000
$2,882 64,049 - - - - - - $2,882
64,049
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu