Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2014 |
Principal Product | Hydrogen Peroxide |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 56 |
Plant Area (Sq.Ft.) | 59,000 |
Annual Production | 75,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,870,226 | 66,271,000 | kWh | $0.06 |
Natural Gas | $4,524,398 | 1,007,661 | MMBtu | $4.49 |
TOTAL ENERGY COSTS | $8,410,984 | |||
RECOMMENDED SAVINGS* | $298,150 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $41,856 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Natural Gas | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $14,166 Cost: $5,000 |
- | - | $14,166 | 3,155 | - | - |
- - kWh |
$14,166 3,155 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $26,051 Cost: $22,000 |
- | - | $14,719 | 3,278 | $11,332 | 10,512,000 |
- - kWh |
$14,719 3,278 MMBtu |
$11,332 10,512,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,000 Cost: $20,000 |
$18,000 | 308,219 | - | - | - | - |
$18,000 308,219 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,000 Cost: $10,000 |
$6,000 | 102,740 | - | - | - | - |
$6,000 102,740 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,639 Cost: $4,000 |
$1,639 | 28,069 | - | - | - | - |
$1,639 28,069 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $30,695 Cost: $30,000 |
$30,695 | 525,600 | - | - | - | - |
$30,695 525,600 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,301 Cost: $50,000 |
$13,301 | 227,760 | - | - | - | - |
$13,301 227,760 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,212 Cost: $30,000 |
$18,212 | 311,856 | - | - | - | - |
$18,212 311,856 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $19,030 Cost: $30,000 |
$19,030 | 325,872 | - | - | - | - |
$19,030 325,872 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,775 Cost: $30,000 |
$18,775 | 321,492 | - | - | - | - |
$18,775 321,492 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $21,435 Cost: $25,000 |
$21,435 | 367,044 | - | - | - | - |
$21,435 367,044 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $20,105 Cost: $25,000 |
$20,105 | 344,268 | - | - | - | - |
$20,105 344,268 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,928 Cost: $30,000 |
$18,928 | 324,120 | - | - | - | - |
$18,928 324,120 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $49,879 Cost: $7,350 |
$49,879 | 854,100 | - | - | - | - |
$49,879 854,100 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,094 Cost: $1,691 |
$3,094 | 52,980 | - | - | - | - |
$3,094 52,980 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $18,840 Cost: $25,000 |
- | - | $18,840 | 4,196 | - | - |
- - kWh |
$18,840 4,196 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $298,150 Cost: $345,041 |
$239,093 | 4,094,120 | $47,725 | 10,629 | $11,332 | 10,512,000 | $239,093 4,094,120 kWh |
$47,725 10,629 MMBtu |
$11,332 10,512,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $41,856 Cost: $31,000 |
$1,639 | 28,069 | $28,885 | 6,433 | $11,332 | 10,512,000 | $1,639 28,069 kWh |
$28,885 6,433 MMBtu |
$11,332 10,512,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||