IAC Assessment: TT0155
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2015
Principal Product Automotive Plastic Exterior Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 172
Plant Area (Sq.Ft.) 108,000
Annual Production 1,225,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $661,732 9,444,000 kWh $0.07
Electricity Demand $244,270 19,380 kW-months/year $12.60
Natural Gas $117,411 12,304 MMBtu $9.54
TOTAL ENERGY COSTS $1,023,413
RECOMMENDED SAVINGS* $107,891 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $107,891
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$35,244
Cost:
$50
$25,912 370,175 $9,332 740 $25,912
370,175
kWh
$9,332
740
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,106
Cost:
$30,000
$19,194 274,200 $6,912 548 $19,194
274,200
kWh
$6,912
548
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,646
Cost:
$40,000
$26,208 374,400 $9,438 749 $26,208
374,400
kWh
$9,438
749
kW-months/year
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,513
Cost:
$625
$8,513 121,611 - - $8,513
121,611
kWh
-
-
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,382
Cost:
$3,000
$2,382 34,039 - - $2,382
34,039
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$107,891
Cost:
$73,675
$82,209 1,174,425 $25,682 2,037 $82,209
1,174,425
kWh
$25,682
2,037
kW-months/year
TOTAL IMPLEMENTED Savings:
$107,891
Cost:
$73,675
$82,209 1,174,425 $25,682 2,037 $82,209
1,174,425
kWh
$25,682
2,037
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand