IAC Assessment: TT0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2016
Principal Product Catalysts and Additives
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 86
Plant Area (Sq.Ft.) 300,000
Annual Production 2,319 Tons
Production Hrs. Annual 8,400
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $402,577 8,817,737 kWh $0.05
Electricity Demand $235,841 22,410 kW-months/year $10.52
Natural Gas $149,213 51,239 MMBtu $2.91
TOTAL ENERGY COSTS $787,631
RECOMMENDED SAVINGS* $54,627 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,294
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$30,315
Cost:
$4,500
- - - - $459 158 $29,856 - -
-
kWh
-
-
kW-months/year
$459
158
MMBtu
$29,856
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,575
Cost:
$3,500
$13,092 284,609 $3,483 331 - - - - $13,092
284,609
kWh
$3,483
331
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,461
Cost:
$3,240
- - - - $3,461 1,189 - - -
-
kWh
-
-
kW-months/year
$3,461
1,189
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,943
Cost:
$1,500
$2,566 55,789 - - $377 130 - - $2,566
55,789
kWh
-
-
kW-months/year
$377
130
MMBtu
-
-
$
05: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$1,333
Cost:
$2,275
$1,005 21,840 $328 31 - - - - $1,005
21,840
kWh
$328
31
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$54,627
Cost:
$15,015
$16,663 362,238 $3,811 362 $4,297 1,476 $29,856 - $16,663
362,238
kWh
$3,811
362
kW-months/year
$4,297
1,476
MMBtu
$29,856
-
$
TOTAL IMPLEMENTED Savings:
$53,294
Cost:
$12,740
$15,658 340,398 $3,483 331 $4,297 1,476 $29,856 - $15,658
340,398
kWh
$3,483
331
kW-months/year
$4,297
1,476
MMBtu
$29,856
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material