IAC Assessment: TT0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2016
Principal Product Carpet
NAICS 314110 - Carpet and Rug Mills
SIC 2273 - Carpets And Rugs
Sales $1,000,000-$5,000,000
# of Employees 200
Plant Area (Sq.Ft.) 215,000
Annual Production 800,000 Units
Production Hrs. Annual 7,738
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $514,181 12,700,800 kWh $0.04
Electricity Demand $416,012 38,664 kW-months/year $10.76
Natural Gas $334,010 90,637 MMBtu $3.69
TOTAL ENERGY COSTS $1,302,674
RECOMMENDED SAVINGS* $20,901 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,530
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$13,371
Cost:
$30,500
$18,994 468,977 $9,652 897 - - $(-13,675) (-2,228,544) $(-1,600) - $18,994
468,977
kWh
$9,652
897
kW-months/year
-
-
MMBtu
$(-13,675)
(-2,228,544)
gal
$(-1,600)
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,212
Cost:
$1,500
- - - - $2,212 600 - - - - -
-
kWh
-
-
kW-months/year
$2,212
600
MMBtu
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,194
Cost:
$3,000
$2,194 54,166 - - - - - - - - $2,194
54,166
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,630
Cost:
$3,525
$1,630 40,238 - - - - - - - - $1,630
40,238
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,494
Cost:
$130
$1,494 36,909 - - - - - - - - $1,494
36,909
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$20,901
Cost:
$38,655
$24,312 600,290 $9,652 897 $2,212 600 $(-13,675) (-2,228,544) $(-1,600) - $24,312
600,290
kWh
$9,652
897
kW-months/year
$2,212
600
MMBtu
$(-13,675)
(-2,228,544)
gal
$(-1,600)
-
$
TOTAL IMPLEMENTED Savings:
$7,530
Cost:
$8,155
$5,318 131,313 - - $2,212 600 - - - - $5,318
131,313
kWh
-
-
kW-months/year
$2,212
600
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes