Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2016 |
Principal Product | Heat Treating Services |
NAICS | 332811 - Metal Heat Treating |
SIC | 3398 - Metal Heat Treating |
Sales | $1,000,000-$5,000,000 |
# of Employees | 18 |
Plant Area (Sq.Ft.) | 21,100 |
Annual Production | 2,800,000 Units |
Production Hrs. Annual | 6,864 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $130,099 | 1,932,300 | kWh | $0.07 |
Electricity Demand | $61,608 | 6,351 | kW-months/year | $9.70 |
Natural Gas | $136,366 | 37,093 | MMBtu | $3.68 |
TOTAL ENERGY COSTS | $328,073 | |||
RECOMMENDED SAVINGS* | $24,897 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,003 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,244 Cost: $15,800 |
$7,244 | 107,640 | - | - | - | - |
$7,244 107,640 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $6,467 Cost: $250 |
$6,467 | 96,096 | - | - | - | - |
$6,467 96,096 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,803 Cost: $500 |
$4,803 | 71,365 | - | - | - | - |
$4,803 71,365 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,669 Cost: $1,720 |
- | - | - | - | $2,669 | 726 |
- - kWh |
- - kW-months/year |
$2,669 726 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,603 Cost: $5,250 |
- | - | $1,603 | 134 | - | - |
- - kWh |
$1,603 134 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,002 Cost: $1,400 |
- | - | - | - | $1,002 | 272 |
- - kWh |
- - kW-months/year |
$1,002 272 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $663 Cost: $150 |
$663 | 9,846 | - | - | - | - |
$663 9,846 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $338 Cost: $75 |
$270 | 4,024 | $68 | 7 | - | - |
$270 4,024 kWh |
$68 7 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $108 Cost: $23 |
$68 | 1,005 | - | - | $40 | 11 |
$68 1,005 kWh |
- - kW-months/year |
$40 11 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,897 Cost: $25,168 |
$19,515 | 289,976 | $1,671 | 141 | $3,711 | 1,009 | $19,515 289,976 kWh |
$1,671 141 kW-months/year |
$3,711 1,009 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,003 Cost: $1,625 |
$933 | 13,870 | $68 | 7 | $1,002 | 272 | $933 13,870 kWh |
$68 7 kW-months/year |
$1,002 272 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |