IAC Assessment: TT0196
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0196
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2017
Principal Product Hydro-static Transmissions and Rear Differentials
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 190
Plant Area (Sq.Ft.) 215,000
Annual Production 900,000 Units
Production Hrs. Annual 6,912
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $528,167 8,485,470 kWh $0.06
Electricity Demand $240,603 19,822 kW-months/year $12.14
Natural Gas $19,532 3,065 MMBtu $6.37
TOTAL ENERGY COSTS $788,302
RECOMMENDED SAVINGS* $68,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$36,417
Cost:
$148,815
$36,417 548,000 - - $36,417
548,000
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$19,605
Cost:
$3,050
$19,605 315,187 - - $19,605
315,187
kWh
-
-
kW-months/year
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,438
Cost:
$19,250
- - $5,438 376 -
-
kWh
$5,438
376
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,985
Cost:
$31
$3,724 59,817 $1,261 104 $3,724
59,817
kWh
$1,261
104
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,539
Cost:
$1,150
$2,539 40,825 - - $2,539
40,825
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$68,984
Cost:
$172,296
$62,285 963,829 $6,699 480 $62,285
963,829
kWh
$6,699
480
kW-months/year
TOTAL IMPLEMENTED Savings:
$19,605
Cost:
$3,050
$19,605 315,187 - - $19,605
315,187
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand