Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2017 |
Principal Product | Body sub-assemblies for vehicles |
NAICS | 336370 - Motor Vehicle Metal Stamping |
SIC | 3465 - Automotive Stampings |
Sales | $100,000,000-$500,000,000 |
# of Employees | 374 |
Plant Area (Sq.Ft.) | 269,060 |
Annual Production | 650,000 Units |
Production Hrs. Annual | 6,360 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $394,298 | 11,020,010 | kWh | $0.04 |
Electricity Demand | $202,004 | 24,655 | kW-months/year | $8.19 |
Natural Gas | $26,911 | 6,762 | MMBtu | $3.98 |
TOTAL ENERGY COSTS | $623,213 | |||
RECOMMENDED SAVINGS* | $38,078 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,330 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,941 Cost: $3,050 |
$9,941 | 277,692 | - | - | - | - |
$9,941 277,692 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $9,558 Cost: $46,250 |
$9,806 | 273,917 | - | - | $(-248) | (-62) |
$9,806 273,917 kWh |
- - kW-months/year |
$(-248) (-62) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,931 Cost: $15,000 |
- | - | - | - | $6,931 | 1,741 |
- - kWh |
- - kW-months/year |
$6,931 1,741 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,952 Cost: $15,000 |
$3,952 | 110,400 | - | - | - | - |
$3,952 110,400 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,708 Cost: $63 |
$2,823 | 78,861 | $885 | 108 | - | - |
$2,823 78,861 kWh |
$885 108 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $2,216 Cost: $7,500 |
$2,216 | 61,896 | - | - | - | - |
$2,216 61,896 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,772 Cost: $1,000 |
$1,349 | 37,668 | $423 | 52 | - | - |
$1,349 37,668 kWh |
$423 52 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,078 Cost: $87,863 |
$30,087 | 840,434 | $1,308 | 160 | $6,683 | 1,679 | $30,087 840,434 kWh |
$1,308 160 kW-months/year |
$6,683 1,679 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,330 Cost: $47,250 |
$11,155 | 311,585 | $423 | 52 | $(-248) | (-62) | $11,155 311,585 kWh |
$423 52 kW-months/year |
$(-248) (-62) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |