IAC Assessment: TT0205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2018
Principal Product engines
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales >$500,000,000
# of Employees 2,000
Plant Area (Sq.Ft.) 1,130,000
Annual Production 1,000,000 Units
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $6,004,079 165,117,994 kWh $0.04
Electricity Demand $3,349,574 621,158 kW-months/year $5.39
Natural Gas $525,576 110,121 MMBtu $4.77
TOTAL ENERGY COSTS $10,339,750
RECOMMENDED SAVINGS* $855,318 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $376,439
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$376,439
Cost:
$20
$312,927 8,596,894 $63,512 11,777 - - $312,927
8,596,894
kWh
$63,512
11,777
kW-months/year
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$376,439
Cost:
$1,600
$312,927 8,596,894 $63,512 11,777 - - $312,927
8,596,894
kWh
$63,512
11,777
kW-months/year
-
-
Tgal
03: 3.4155 METER WASTE WATER Savings:
$30,463
Cost:
$1,000
- - - - $30,463 5,166 -
-
kWh
-
-
kW-months/year
$30,463
5,166
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$28,188
Cost:
$132,000
- - $28,188 5,228 - - -
-
kWh
$28,188
5,228
kW-months/year
-
-
Tgal
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$19,941
Cost:
$160
$19,941 547,836 - - - - $19,941
547,836
kWh
-
-
kW-months/year
-
-
Tgal
06: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$9,911
Cost:
$10,800
$8,164 226,800 $1,747 324 - - $8,164
226,800
kWh
$1,747
324
kW-months/year
-
-
Tgal
07: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$8,761
Cost:
$8,362
$3,053 83,880 $5,708 1,059 - - $3,053
83,880
kWh
$5,708
1,059
kW-months/year
-
-
Tgal
08: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$5,176
Cost:
$6,900
$4,264 118,440 $912 169 - - $4,264
118,440
kWh
$912
169
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$855,318
Cost:
$160,842
$661,276 18,170,744 $163,579 30,334 $30,463 5,166 $661,276
18,170,744
kWh
$163,579
30,334
kW-months/year
$30,463
5,166
Tgal
TOTAL IMPLEMENTED Savings:
$376,439
Cost:
$20
$312,927 8,596,894 $63,512 11,777 - - $312,927
8,596,894
kWh
$63,512
11,777
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal