Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2019 |
Principal Product | Moist and Dry Snuff |
NAICS | 312230 - Tobacco Manufacturing |
SIC | 2131 - Chewing And Smoking Tobacco |
Sales | $100,000,000-$500,000,000 |
# of Employees | 153 |
Plant Area (Sq.Ft.) | 843,581 |
Annual Production | 35,765,716 Units |
Production Hrs. Annual | 4,160 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $859,271 | 14,547,840 | kWh | $0.06 |
Electricity Demand | $342,844 | 37,335 | kW-months/year | $9.18 |
Natural Gas | $298,525 | 40,116 | MMBtu | $7.44 |
TOTAL ENERGY COSTS | $1,576,760 | |||
RECOMMENDED SAVINGS* | $78,039 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $55,623 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $37,500 Cost: - |
- | - | - | - | - | - | $37,500 | 1,500,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$37,500 1,500,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $13,000 Cost: $6,000 |
- | - | - | - | $13,000 | 1,747 | - | - |
- - kWh |
- - kW-months/year |
$13,000 1,747 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $8,935 Cost: $39,040 |
$8,935 | 151,190 | - | - | - | - | - | - |
$8,935 151,190 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $6,630 Cost: $30,000 |
- | - | - | - | $6,630 | 891 | - | - |
- - kWh |
- - kW-months/year |
$6,630 891 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,238 Cost: $3,200 |
$5,187 | 87,770 | $1,051 | 115 | - | - | - | - |
$5,187 87,770 kWh |
$1,051 115 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM |
Savings: $2,786 Cost: $10,000 |
- | - | - | - | $2,786 | 374 | - | - |
- - kWh |
- - kW-months/year |
$2,786 374 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,661 Cost: $1,618 |
$2,661 | 44,492 | - | - | - | - | - | - |
$2,661 44,492 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $289 Cost: $20 |
$289 | 4,892 | - | - | - | - | - | - |
$289 4,892 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,039 Cost: $89,878 |
$17,072 | 288,344 | $1,051 | 115 | $22,416 | 3,013 | $37,500 | 1,500,000 | $17,072 288,344 kWh |
$1,051 115 kW-months/year |
$22,416 3,013 MMBtu |
$37,500 1,500,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $55,623 Cost: $43,878 |
$17,072 | 288,344 | $1,051 | 115 | - | - | $37,500 | 1,500,000 | $17,072 288,344 kWh |
$1,051 115 kW-months/year |
- - MMBtu |
$37,500 1,500,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |