IAC logo
IAC Assessment: TT0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2020
Principal Product Metal Power Poles
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $50,000,000-$100,000,000
# of Employees 215
Plant Area (Sq.Ft.) 115,000
Annual Production 150,000 Units
Production Hrs. Annual 6,864
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,021 2,563,000 kWh $0.06
Electricity Demand $82,135 7,562 kW-months/year $10.86
Natural Gas $52,648 7,579 MMBtu $6.95
TOTAL ENERGY COSTS $294,332
RECOMMENDED SAVINGS* $15,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,227
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,084
Cost:
$1,500
$7,695 125,611 $2,389 220 - - $7,695
125,611
kWh
$2,389
220
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,143
Cost:
$150
$2,143 34,979 - - - - $2,143
34,979
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,789
Cost:
$4,500
- - - - $1,789 258 -
-
kWh
-
-
kW-months/year
$1,789
258
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,356
Cost:
$900
$1,356 22,131 - - - - $1,356
22,131
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,372
Cost:
$7,050
$11,194 182,721 $2,389 220 $1,789 258 $11,194
182,721
kWh
$2,389
220
kW-months/year
$1,789
258
MMBtu
TOTAL IMPLEMENTED Savings:
$12,227
Cost:
$1,650
$9,838 160,590 $2,389 220 - - $9,838
160,590
kWh
$2,389
220
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas