Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2021 |
Principal Product | Walk-in Coolers/Freezers and Refrigeration Systems |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $50,000,000-$100,000,000 |
# of Employees | 272 |
Plant Area (Sq.Ft.) | 145,162 |
Annual Production | 540,000 Units |
Production Hrs. Annual | 2,600 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $86,151 | 1,096,800 | kWh | $0.08 |
Electricity Demand | $42,538 | 4,114 | kW-months/year | $10.34 |
Natural Gas | $17,540 | 1,681 | MMBtu | $10.43 |
LPG | $15,891 | 519 | MMBtu | $30.65 |
TOTAL ENERGY COSTS | $268,428 | |||
RECOMMENDED SAVINGS* | $37,122 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,072 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | LPG | Other Liquid (non-haz) | Gaseous Waste | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | LPG | Other Liquid (non-haz) | Gaseous Waste | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8226 INCREASE EFFICIENCY OF TRUCKS |
Savings: $17,586 Cost: - |
$(-2,465) | (-31,200) | - | - | - | - | $15,891 | 519 | - | - | - | - | $4,160 | - |
$(-2,465) (-31,200) kWh |
- - kW-months/year |
- - MMBtu |
$15,891 519 MMBtu |
- - gal |
- - lb |
$4,160 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $6,326 Cost: $27,000 |
$6,326 | 80,586 | - | - | - | - | - | - | - | - | - | - | - | - |
$6,326 80,586 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $5,205 Cost: $3,000 |
$5,205 | 66,306 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,205 66,306 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM |
Savings: $2,240 Cost: $4,500 |
- | - | - | - | $530 | 50 | - | - | $710 | 23,667 | $1,000 | 167 | - | - |
- - kWh |
- - kW-months/year |
$530 50 MMBtu |
- - MMBtu |
$710 23,667 gal |
$1,000 167 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,600 Cost: $160 |
$1,600 | 20,382 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,600 20,382 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $1,587 Cost: $3,500 |
$987 | 12,576 | $600 | 58 | - | - | - | - | - | - | - | - | - | - |
$987 12,576 kWh |
$600 58 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4153 AVOID EMERGENCY REWIND OF MOTORS |
Savings: $1,333 Cost: $400 |
- | - | - | - | - | - | - | - | - | - | - | - | $1,333 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
$1,333 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,245 Cost: $1,068 |
$1,245 | 15,800 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,245 15,800 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,122 Cost: $39,628 |
$12,898 | 164,450 | $600 | 58 | $530 | 50 | $15,891 | 519 | $710 | 23,667 | $1,000 | 167 | $5,493 | - | $12,898 164,450 kWh |
$600 58 kW-months/year |
$530 50 MMBtu |
$15,891 519 MMBtu |
$710 23,667 gal |
$1,000 167 lb |
$5,493 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,072 Cost: $35,400 |
$4,848 | 61,962 | $600 | 58 | $530 | 50 | $15,891 | 519 | $710 | 23,667 | $1,000 | 167 | $5,493 | - | $4,848 61,962 kWh |
$600 58 kW-months/year |
$530 50 MMBtu |
$15,891 519 MMBtu |
$710 23,667 gal |
$1,000 167 lb |
$5,493 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | LPG | Other Liquid (non-haz) | Gaseous Waste | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | LPG | Other Liquid (non-haz) | Gaseous Waste | Administrative Changes |