Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2021 |
Principal Product | Engineered Plastics |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 207,000 |
Annual Production | 216,000,000 Pounds |
Production Hrs. Annual | 8,640 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,500,045 | 27,075,445 | kWh | $0.06 |
Electricity Demand | $932,575 | 151,845 | kW-months/year | $6.14 |
Natural Gas | $372,950 | 47,974 | MMBtu | $7.77 |
TOTAL ENERGY COSTS | $2,886,648 | |||
RECOMMENDED SAVINGS* | $93,087 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $65,709 Cost: $230,400 |
$(-958) | (-17,297) | - | - | - | - | $36,168 | 9,468 | $49,139 | 9,468 | $(-18,640) | - |
$(-958) (-17,297) kWh |
- - kW-months/year |
- - MMBtu |
$36,168 9,468 Tgal |
$49,139 9,468 Tgal |
$(-18,640) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $10,627 Cost: $25,000 |
- | - | - | - | $10,627 | 1,367 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,627 1,367 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,751 Cost: $37,500 |
$7,751 | 139,903 | - | - | - | - | - | - | - | - | - | - |
$7,751 139,903 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,652 Cost: $4,000 |
$3,170 | 57,229 | $482 | 78 | - | - | - | - | - | - | - | - |
$3,170 57,229 kWh |
$482 78 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,092 Cost: $10,000 |
$2,092 | 37,764 | - | - | - | - | - | - | - | - | - | - |
$2,092 37,764 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $1,703 Cost: $7,500 |
- | - | - | - | $1,703 | 219 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,703 219 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE |
Savings: $1,108 Cost: $5,000 |
$1,108 | 20,007 | - | - | - | - | - | - | - | - | - | - |
$1,108 20,007 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $445 Cost: - |
$(-1,925) | (-34,744) | $(-553) | (-90) | - | - | - | - | - | - | $2,923 | - |
$(-1,925) (-34,744) kWh |
$(-553) (-90) kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
$2,923 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $93,087 Cost: $319,400 |
$11,238 | 202,862 | $(-71) | (-12) | $12,330 | 1,586 | $36,168 | 9,468 | $49,139 | 9,468 | $(-15,717) | - | $11,238 202,862 kWh |
$(-71) (-12) kW-months/year |
$12,330 1,586 MMBtu |
$36,168 9,468 Tgal |
$49,139 9,468 Tgal |
$(-15,717) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Ancillary Material Cost |