Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2021
Principal Product Wire and Cable
NAICS 335921 - Fiber Optic Cable Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 109
Plant Area (Sq.Ft.) 182,859
Annual Production 421,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $626,303 10,069,880 kWh $0.06
Electricity Demand $241,357 21,268 kW-months/year $11.35
Natural Gas $9,812 1,328 MMBtu $7.39
TOTAL ENERGY COSTS $900,092
RECOMMENDED SAVINGS* $319,413 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $269,726
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$188,912
Cost:
$733,702
$51,499 827,960 $269 24 $137,144 - $51,499
827,960
kWh
$269
24
kW-months/year
$137,144
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$49,358
Cost:
$3,200
$36,163 581,400 $13,195 1,163 - - $36,163
581,400
kWh
$13,195
1,163
kW-months/year
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$30,912
Cost:
$38,200
$30,912 496,973 - - - - $30,912
496,973
kWh
-
-
kW-months/year
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$26,082
Cost:
$700
$26,082 419,328 - - - - $26,082
419,328
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,133
Cost:
$3,000
$8,669 139,370 $464 41 - - $8,669
139,370
kWh
$464
41
kW-months/year
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,718
Cost:
$15,000
$6,718 108,006 - - - - $6,718
108,006
kWh
-
-
kW-months/year
-
-
$
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,374
Cost:
-
$4,250 68,550 $1,124 99 - - $4,250
68,550
kWh
$1,124
99
kW-months/year
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,221
Cost:
$9,600
$2,221 35,703 - - - - $2,221
35,703
kWh
-
-
kW-months/year
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$703
Cost:
$850
$515 8,280 $188 17 - - $515
8,280
kWh
$188
17
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$319,413
Cost:
$804,252
$167,029 2,685,570 $15,240 1,343 $137,144 - $167,029
2,685,570
kWh
$15,240
1,343
kW-months/year
$137,144
-
$
TOTAL IMPLEMENTED Savings:
$269,726
Cost:
$737,602
$117,994 1,897,238 $14,588 1,286 $137,144 - $117,994
1,897,238
kWh
$14,588
1,286
kW-months/year
$137,144
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost