IAC logo
IAC Assessment: TT0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2021
Principal Product Automotive Exterior Products - spoilers & bsm
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 117
Plant Area (Sq.Ft.) 45,600
Annual Production 340,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $555,156 8,073,600 kWh $0.07
Electricity Demand $230,563 16,440 kW-months/year $14.02
Natural Gas $94,458 12,050 MMBtu $7.84
TOTAL ENERGY COSTS $887,973
RECOMMENDED SAVINGS* $66,201 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,669
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$44,686
Cost:
$476,000
$44,686 647,625 - - $44,686
647,625
kWh
-
-
kW-months/year
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$7,441
Cost:
$15,000
$5,674 82,236 $1,767 126 $5,674
82,236
kWh
$1,767
126
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,405
Cost:
$1,640
$4,228 61,276 $1,177 84 $4,228
61,276
kWh
$1,177
84
kW-months/year
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,646
Cost:
$3,879
$4,646 67,339 - - $4,646
67,339
kWh
-
-
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,023
Cost:
$2,762
$4,023 58,861 - - $4,023
58,861
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$66,201
Cost:
$499,281
$63,257 917,337 $2,944 210 $63,257
917,337
kWh
$2,944
210
kW-months/year
TOTAL IMPLEMENTED Savings:
$8,669
Cost:
$6,641
$8,669 126,200 - - $8,669
126,200
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand