IAC Assessment: TT0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2022
Principal Product Plastics
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 168,000
Annual Production 170,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,010,674 28,152,286 kWh $0.04
Electricity Demand $622,425 102,672 kW-months/year $6.06
Electricity Fees $(-88,314) - $ -
Natural Gas $82,162 7,661 MMBtu $10.72
TOTAL ENERGY COSTS $1,674,866
RECOMMENDED SAVINGS* $96,181 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,223
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,947
Cost:
$60,000
$40,876 1,238,664 $5,071 848 - - - - $40,876
1,238,664
kWh
$5,071
848
kW-months/year
-
-
$
-
-
$
02: 2.6123 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS Savings:
$17,027
Cost:
$10,000
- - - - - - $17,027 - -
-
kWh
-
-
kW-months/year
-
-
$
$17,027
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,583
Cost:
$49,071
- - - - $14,583 - - - -
-
kWh
-
-
kW-months/year
$14,583
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,268
Cost:
$3,480
$9,268 280,846 - - - - - - $9,268
280,846
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,223
Cost:
$500
- - - - $4,223 - - - -
-
kWh
-
-
kW-months/year
$4,223
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,691
Cost:
$2,695
$2,691 81,545 - - - - - - $2,691
81,545
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,442
Cost:
$6,000
$1,949 59,070 $493 83 - - - - $1,949
59,070
kWh
$493
83
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$96,181
Cost:
$131,746
$54,784 1,660,125 $5,564 931 $18,806 - $17,027 - $54,784
1,660,125
kWh
$5,564
931
kW-months/year
$18,806
-
$
$17,027
-
$
TOTAL IMPLEMENTED Savings:
$4,223
Cost:
$500
- - - - $4,223 - - - -
-
kWh
-
-
kW-months/year
$4,223
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes