IAC Assessment: TT0282
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0282
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2022
Principal Product Yeast
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 58
Plant Area (Sq.Ft.) 66,828
Annual Production 94,267,981 Pounds
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,556,196 25,511,000 kWh $0.06
Electricity Demand $611,820 51,565 kW-months/year $11.87
Natural Gas $390,272 84,087 MMBtu $4.64
TOTAL ENERGY COSTS $4,398,369
RECOMMENDED SAVINGS* $1,422,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,323,104
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$816,618
Cost:
$2,873,364
$683,845 11,210,566 $173,597 14,630 $43,477 9,368 $(-84,301) - $683,845
11,210,566
kWh
$173,597
14,630
kW-months/year
$43,477
9,368
MMBtu
$(-84,301)
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$360,908
Cost:
$51,360
$263,271 4,315,924 - - $97,637 21,038 - - $263,271
4,315,924
kWh
-
-
kW-months/year
$97,637
21,038
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$99,184
Cost:
$280,000
$78,754 1,291,052 - - $20,430 4,402 - - $78,754
1,291,052
kWh
-
-
kW-months/year
$20,430
4,402
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$48,725
Cost:
$152,000
$48,725 798,782 - - - - - - $48,725
798,782
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$42,363
Cost:
$21,260
$42,363 694,483 - - - - - - $42,363
694,483
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,290
Cost:
$58,960
$41,290 676,887 - - - - - - $41,290
676,887
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,200
Cost:
$15,000
$10,424 170,895 $2,776 234 - - - - $10,424
170,895
kWh
$2,776
234
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$542
Cost:
$1,120
$542 8,971 - - - - - - $542
8,971
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,422,830
Cost:
$3,453,064
$1,169,214 19,167,560 $176,373 14,864 $161,544 34,808 $(-84,301) - $1,169,214
19,167,560
kWh
$176,373
14,864
kW-months/year
$161,544
34,808
MMBtu
$(-84,301)
-
$
TOTAL IMPLEMENTED Savings:
$1,323,104
Cost:
$3,171,944
$1,089,918 17,867,537 $176,373 14,864 $141,114 30,406 $(-84,301) - $1,089,918
17,867,537
kWh
$176,373
14,864
kW-months/year
$141,114
30,406
MMBtu
$(-84,301)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes