Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2022 |
Principal Product | Yeast |
NAICS | 311999 - All Other Miscellaneous Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 58 |
Plant Area (Sq.Ft.) | 66,828 |
Annual Production | 94,267,981 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,556,196 | 25,511,000 | kWh | $0.06 |
Electricity Demand | $611,820 | 51,565 | kW-months/year | $11.87 |
Natural Gas | $390,272 | 84,087 | MMBtu | $4.64 |
TOTAL ENERGY COSTS | $4,398,369 | |||
RECOMMENDED SAVINGS* | $1,422,830 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,323,104 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT |
Savings: $816,618 Cost: $2,873,364 |
$683,845 | 11,210,566 | $173,597 | 14,630 | $43,477 | 9,368 | $(-84,301) | - |
$683,845 11,210,566 kWh |
$173,597 14,630 kW-months/year |
$43,477 9,368 MMBtu |
$(-84,301) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $360,908 Cost: $51,360 |
$263,271 | 4,315,924 | - | - | $97,637 | 21,038 | - | - |
$263,271 4,315,924 kWh |
- - kW-months/year |
$97,637 21,038 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $99,184 Cost: $280,000 |
$78,754 | 1,291,052 | - | - | $20,430 | 4,402 | - | - |
$78,754 1,291,052 kWh |
- - kW-months/year |
$20,430 4,402 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $48,725 Cost: $152,000 |
$48,725 | 798,782 | - | - | - | - | - | - |
$48,725 798,782 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $42,363 Cost: $21,260 |
$42,363 | 694,483 | - | - | - | - | - | - |
$42,363 694,483 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $41,290 Cost: $58,960 |
$41,290 | 676,887 | - | - | - | - | - | - |
$41,290 676,887 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,200 Cost: $15,000 |
$10,424 | 170,895 | $2,776 | 234 | - | - | - | - |
$10,424 170,895 kWh |
$2,776 234 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $542 Cost: $1,120 |
$542 | 8,971 | - | - | - | - | - | - |
$542 8,971 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,422,830 Cost: $3,453,064 |
$1,169,214 | 19,167,560 | $176,373 | 14,864 | $161,544 | 34,808 | $(-84,301) | - | $1,169,214 19,167,560 kWh |
$176,373 14,864 kW-months/year |
$161,544 34,808 MMBtu |
$(-84,301) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,323,104 Cost: $3,171,944 |
$1,089,918 | 17,867,537 | $176,373 | 14,864 | $141,114 | 30,406 | $(-84,301) | - | $1,089,918 17,867,537 kWh |
$176,373 14,864 kW-months/year |
$141,114 30,406 MMBtu |
$(-84,301) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |