IAC Assessment: TT0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2023
Principal Product Plastic Caps
NAICS 325991 - Custom Compounding of Purchased Resins
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 135,000
Annual Production 3,800,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,324,125 26,866,000 kWh $0.05
Electricity Demand $466,382 72,478 kW-months/year $6.43
Natural Gas $23,566 2,623 MMBtu $8.98
TOTAL ENERGY COSTS $1,814,073
RECOMMENDED SAVINGS* $90,654 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,136
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,836
Cost:
$40
$2,406 48,793 $430 67 - - $2,406
48,793
kWh
$430
67
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,365
Cost:
$1,405
$5,281 107,111 $85 13 - - $5,281
107,111
kWh
$85
13
kW-months/year
-
-
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,799
Cost:
$2,000
$5,799 117,629 - - - - $5,799
117,629
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,798
Cost:
$13,000
- - - - $13,798 1,535 -
-
kWh
-
-
kW-months/year
$13,798
1,535
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,719
Cost:
$1,609
$1,101 22,338 $618 96 - - $1,101
22,338
kWh
$618
96
kW-months/year
-
-
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$61,137
Cost:
$119,000
$51,798 1,050,661 $9,340 1,451 - - $51,798
1,050,661
kWh
$9,340
1,451
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$90,654
Cost:
$137,054
$66,384 1,346,533 $10,473 1,627 $13,798 1,535 $66,384
1,346,533
kWh
$10,473
1,627
kW-months/year
$13,798
1,535
MMBtu
TOTAL IMPLEMENTED Savings:
$83,136
Cost:
$133,445
$59,484 1,206,565 $9,855 1,531 $13,798 1,535 $59,484
1,206,565
kWh
$9,855
1,531
kW-months/year
$13,798
1,535
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas