Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2023 |
Principal Product | swiss rolls and buddy bars |
NAICS | 311812 - Commercial Bakeries |
SIC | 2052 - Cookies And Crackers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 265 |
Plant Area (Sq.Ft.) | 35,000 |
Annual Production | 46,023,692 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $354,016 | 3,404,000 | kWh | $0.10 |
Electricity Demand | $96,153 | 7,571 | kW-months/year | $12.70 |
Natural Gas | $328,858 | 36,550 | MMBtu | $9.00 |
TOTAL ENERGY COSTS | $797,990 | |||
RECOMMENDED SAVINGS* | $133,236 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $109,759 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Ancillary Material Cost | By-product Production | Electricity Usage | Natural Gas | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $106,623 Cost: $200,000 |
- | - | - | - | $106,623 | - | - | - |
- - kWh |
- - MMBtu |
$106,623 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $21,000 Cost: $2,000 |
- | - | - | - | - | - | $21,000 | - |
- - kWh |
- - MMBtu |
- - $ |
$21,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,477 Cost: $10,500 |
- | - | $2,477 | 275 | - | - | - | - |
- - kWh |
$2,477 275 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,702 Cost: $1,755 |
$1,702 | 16,366 | - | - | - | - | - | - |
$1,702 16,366 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $911 Cost: $30 |
$911 | 8,760 | - | - | - | - | - | - |
$911 8,760 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $523 Cost: $1,150 |
$523 | 5,025 | - | - | - | - | - | - |
$523 5,025 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $133,236 Cost: $215,435 |
$3,136 | 30,151 | $2,477 | 275 | $106,623 | - | $21,000 | - | $3,136 30,151 kWh |
$2,477 275 MMBtu |
$106,623 - $ |
$21,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $109,759 Cost: $202,935 |
$3,136 | 30,151 | - | - | $106,623 | - | - | - | $3,136 30,151 kWh |
- - MMBtu |
$106,623 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Ancillary Material Cost | By-product Production | Electricity Usage | Natural Gas | Ancillary Material Cost | By-product Production |