Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2023 |
Principal Product | Dump Truck Beds |
NAICS | 336211 - Motor Vehicle Body Manufacturing |
SIC | 3713 - Truck And Bus Bodies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 500 Units |
Production Hrs. Annual | 2,080 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $167,806 | 2,312,143 | kWh | $0.07 |
Electricity Demand | $104,381 | 7,809 | kW-months/year | $13.37 |
Natural Gas | $167,016 | 15,576 | MMBtu | $10.72 |
LPG | $9,672 | 285 | MMBtu | $33.94 |
TOTAL ENERGY COSTS | $452,475 | |||
RECOMMENDED SAVINGS* | $52,865 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $49,840 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $20,707 Cost: $1,500 |
$10,120 | 139,392 | $10,587 | 792 | - | - | - | - |
$10,120 139,392 kWh |
$10,587 792 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $10,120 Cost: - |
$(-1,892) | (-26,060) | - | - | $9,672 | 285 | $2,340 | - |
$(-1,892) (-26,060) kWh |
- - kW-months/year |
$9,672 285 MMBtu |
$2,340 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $7,910 Cost: $600 |
$7,910 | 108,953 | - | - | - | - | - | - |
$7,910 108,953 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $6,615 Cost: $31,320 |
$6,615 | 91,118 | - | - | - | - | - | - |
$6,615 91,118 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $3,025 Cost: $10,040 |
$3,025 | 41,677 | - | - | - | - | - | - |
$3,025 41,677 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $2,199 Cost: - |
$2,199 | 30,295 | - | - | - | - | - | - |
$2,199 30,295 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $923 Cost: $1,600 |
$21 | 294 | - | - | - | - | $902 | - |
$21 294 kWh |
- - kW-months/year |
- - MMBtu |
$902 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $736 Cost: $170 |
$676 | 9,314 | $60 | 4 | - | - | - | - |
$676 9,314 kWh |
$60 4 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $630 Cost: $2,000 |
$630 | 8,630 | - | - | - | - | - | - |
$630 8,630 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,865 Cost: $47,230 |
$29,304 | 403,613 | $10,647 | 796 | $9,672 | 285 | $3,242 | - | $29,304 403,613 kWh |
$10,647 796 kW-months/year |
$9,672 285 MMBtu |
$3,242 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $49,840 Cost: $37,190 |
$26,279 | 361,936 | $10,647 | 796 | $9,672 | 285 | $3,242 | - | $26,279 361,936 kWh |
$10,647 796 kW-months/year |
$9,672 285 MMBtu |
$3,242 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Ancillary Material Cost |