Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2023 |
Principal Product | Vehicle Structural Components |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 325 |
Plant Area (Sq.Ft.) | 131,000 |
Annual Production | 5,560 Tons |
Production Hrs. Annual | 6,000 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,457,151 | 21,204,090 | kWh | $0.07 |
Electricity Demand | $292,789 | 48,265 | kW-months/year | $6.07 |
Natural Gas | $1,546,293 | 196,810 | MMBtu | $7.86 |
TOTAL ENERGY COSTS | $3,296,233 | |||
RECOMMENDED SAVINGS* | $656,518 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $114,161 |
#|Description |
Savings Cost |
Status | Electricity Usage | One-time Revenue or Avoided Cost | Electricity Usage | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $23,069 Cost: $270 |
$23,069 | 335,700 | - | - |
$23,069 335,700 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $66,640 Cost: $2,000 |
- | - | $66,640 | - |
- - kWh |
$66,640 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $200,000 Cost: $10,000 |
- | - | $200,000 | - |
- - kWh |
$200,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $22,207 Cost: $1,640 |
$22,207 | 323,150 | - | - |
$22,207 323,150 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,264 Cost: $1,920 |
$3,264 | 47,498 | - | - |
$3,264 47,498 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $81,000 Cost: $60,000 |
- | - | $81,000 | - |
- - kWh |
$81,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $41,037 Cost: $32,500 |
- | - | $41,037 | - |
- - kWh |
$41,037 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $5,078 Cost: $4,500 |
$5,078 | 73,890 | - | - |
$5,078 73,890 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,690 Cost: $8,100 |
$7,690 | 111,900 | - | - |
$7,690 111,900 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $203,680 Cost: $300,000 |
- | - | $203,680 | - |
- - kWh |
$203,680 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER |
Savings: $2,853 Cost: $7,500 |
$2,853 | 41,512 | - | - |
$2,853 41,512 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $656,518 Cost: $428,430 |
$64,161 | 933,650 | $592,357 | - | $64,161 933,650 kWh |
$592,357 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $114,161 Cost: $71,660 |
$33,161 | 482,548 | $81,000 | - | $33,161 482,548 kWh |
$81,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | One-time Revenue or Avoided Cost | Electricity Usage | One-time Revenue or Avoided Cost |