IAC Assessment: TT0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2023
Principal Product Hardwood Flooring
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 192,000
Annual Production 1,800,000 Units
Production Hrs. Annual 2,210
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $560,701 14,528,057 kWh $0.04
Electricity Demand $584,582 30,412 kW-months/year $19.22
Natural Gas $13,468 1,137 MMBtu $11.85
LPG $29,182 1,340 MMBtu $21.78
Wood $636,615 451,500 MMBtu $1.41
TOTAL ENERGY COSTS $1,880,816
RECOMMENDED SAVINGS* $147,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,112
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Wood Administrative Changes Electricity Usage Electricity Demand LPG Wood Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$47,506
Cost:
$76,760
- - - - - - $47,506 33,692 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$47,506
33,692
MMBtu
-
-
$
02: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$40,702
Cost:
$210,000
$59,174 1,533,000 $40,366 2,100 - - $(-43,508) (-30,857) $(-15,330) - $59,174
1,533,000
kWh
$40,366
2,100
kW-months/year
-
-
MMBtu
$(-43,508)
(-30,857)
MMBtu
$(-15,330)
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$32,720
Cost:
$15,200
$(-3,090) (-80,077) - - $29,182 1,340 - - $6,628 - $(-3,090)
(-80,077)
kWh
-
-
kW-months/year
$29,182
1,340
MMBtu
-
-
MMBtu
$6,628
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,607
Cost:
-
$9,607 248,900 - - - - - - - - $9,607
248,900
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$8,886
Cost:
$220
$8,886 230,215 - - - - - - - - $8,886
230,215
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,899
Cost:
$1,500
$2,132 55,250 $5,767 300 - - - - - - $2,132
55,250
kWh
$5,767
300
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$147,320
Cost:
$303,680
$76,709 1,987,288 $46,133 2,400 $29,182 1,340 $3,998 2,835 $(-8,702) - $76,709
1,987,288
kWh
$46,133
2,400
kW-months/year
$29,182
1,340
MMBtu
$3,998
2,835
MMBtu
$(-8,702)
-
$
TOTAL IMPLEMENTED Savings:
$59,112
Cost:
$16,920
$17,535 454,288 $5,767 300 $29,182 1,340 - - $6,628 - $17,535
454,288
kWh
$5,767
300
kW-months/year
$29,182
1,340
MMBtu
-
-
MMBtu
$6,628
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand LPG Wood Administrative Changes Electricity Usage Electricity Demand LPG Wood Administrative Changes