Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2023 |
Principal Product | Hardwood Flooring |
NAICS | 321918 - Other Millwork (including Flooring) |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 192,000 |
Annual Production | 1,800,000 Units |
Production Hrs. Annual | 2,210 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $560,701 | 14,528,057 | kWh | $0.04 |
Electricity Demand | $584,582 | 30,412 | kW-months/year | $19.22 |
Natural Gas | $13,468 | 1,137 | MMBtu | $11.85 |
LPG | $29,182 | 1,340 | MMBtu | $21.78 |
Wood | $636,615 | 451,500 | MMBtu | $1.41 |
TOTAL ENERGY COSTS | $1,880,816 | |||
RECOMMENDED SAVINGS* | $147,320 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,112 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Wood | Administrative Changes | Electricity Usage | Electricity Demand | LPG | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $47,506 Cost: $76,760 |
- | - | - | - | - | - | $47,506 | 33,692 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$47,506 33,692 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT |
Savings: $40,702 Cost: $210,000 |
$59,174 | 1,533,000 | $40,366 | 2,100 | - | - | $(-43,508) | (-30,857) | $(-15,330) | - |
$59,174 1,533,000 kWh |
$40,366 2,100 kW-months/year |
- - MMBtu |
$(-43,508) (-30,857) MMBtu |
$(-15,330) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $32,720 Cost: $15,200 |
$(-3,090) | (-80,077) | - | - | $29,182 | 1,340 | - | - | $6,628 | - |
$(-3,090) (-80,077) kWh |
- - kW-months/year |
$29,182 1,340 MMBtu |
- - MMBtu |
$6,628 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $9,607 Cost: - |
$9,607 | 248,900 | - | - | - | - | - | - | - | - |
$9,607 248,900 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $8,886 Cost: $220 |
$8,886 | 230,215 | - | - | - | - | - | - | - | - |
$8,886 230,215 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,899 Cost: $1,500 |
$2,132 | 55,250 | $5,767 | 300 | - | - | - | - | - | - |
$2,132 55,250 kWh |
$5,767 300 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $147,320 Cost: $303,680 |
$76,709 | 1,987,288 | $46,133 | 2,400 | $29,182 | 1,340 | $3,998 | 2,835 | $(-8,702) | - | $76,709 1,987,288 kWh |
$46,133 2,400 kW-months/year |
$29,182 1,340 MMBtu |
$3,998 2,835 MMBtu |
$(-8,702) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,112 Cost: $16,920 |
$17,535 | 454,288 | $5,767 | 300 | $29,182 | 1,340 | - | - | $6,628 | - | $17,535 454,288 kWh |
$5,767 300 kW-months/year |
$29,182 1,340 MMBtu |
- - MMBtu |
$6,628 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Wood | Administrative Changes | Electricity Usage | Electricity Demand | LPG | Wood | Administrative Changes |