IAC Assessment: TT0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2023
Principal Product Transformer Bushings
NAICS 335311 - Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612 - Transformers, Except Electronic
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 227,430
Annual Production 502,080 Units
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $919,833 12,121,200 kWh $0.08
Electricity Demand $308,389 20,536 kW-months/year $15.02
Natural Gas $62,184 4,609 MMBtu $13.49
TOTAL ENERGY COSTS $1,310,351
RECOMMENDED SAVINGS* $302,173 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$141,741
Cost:
$909,720
$41,228 543,186 - - $513 38 - - $100,000 - $41,228
543,186
kWh
-
-
kW-months/year
$513
38
MMBtu
-
-
Tgal
$100,000
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$61,184
Cost:
$15,000
$61,184 806,113 - - - - - - - - $61,184
806,113
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,359
Cost:
$90,000
$44,359 584,443 - - - - - - - - $44,359
584,443
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,127
Cost:
$1,500
$16,622 219,000 $4,505 300 - - - - - - $16,622
219,000
kWh
$4,505
300
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 3.4155 METER WASTE WATER Savings:
$18,930
Cost:
$1,100
- - - - - - $18,930 3,977 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,930
3,977
Tgal
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,886
Cost:
-
$6,886 90,720 - - - - - - - - $6,886
90,720
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,990
Cost:
$20,000
$4,990 65,750 - - - - - - - - $4,990
65,750
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$2,956
Cost:
$965
$2,956 38,951 - - - - - - - - $2,956
38,951
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$302,173
Cost:
$1,038,285
$178,225 2,348,163 $4,505 300 $513 38 $18,930 3,977 $100,000 - $178,225
2,348,163
kWh
$4,505
300
kW-months/year
$513
38
MMBtu
$18,930
3,977
Tgal
$100,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost