Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2023 |
Principal Product | Transformer Bushings |
NAICS | 335311 - Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612 - Transformers, Except Electronic |
Sales | $100,000,000-$500,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 227,430 |
Annual Production | 502,080 Units |
Production Hrs. Annual | 6,240 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $919,833 | 12,121,200 | kWh | $0.08 |
Electricity Demand | $308,389 | 20,536 | kW-months/year | $15.02 |
Natural Gas | $62,184 | 4,609 | MMBtu | $13.49 |
TOTAL ENERGY COSTS | $1,310,351 | |||
RECOMMENDED SAVINGS* | $302,173 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $181,798 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $141,741 Cost: $909,720 |
$41,228 | 543,186 | - | - | $513 | 38 | - | - | $100,000 | - |
$41,228 543,186 kWh |
- - kW-months/year |
$513 38 MMBtu |
- - Tgal |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $61,184 Cost: $15,000 |
$61,184 | 806,113 | - | - | - | - | - | - | - | - |
$61,184 806,113 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $44,359 Cost: $90,000 |
$44,359 | 584,443 | - | - | - | - | - | - | - | - |
$44,359 584,443 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $21,127 Cost: $1,500 |
$16,622 | 219,000 | $4,505 | 300 | - | - | - | - | - | - |
$16,622 219,000 kWh |
$4,505 300 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4155 METER WASTE WATER |
Savings: $18,930 Cost: $1,100 |
- | - | - | - | - | - | $18,930 | 3,977 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$18,930 3,977 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $6,886 Cost: - |
$6,886 | 90,720 | - | - | - | - | - | - | - | - |
$6,886 90,720 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,990 Cost: $20,000 |
$4,990 | 65,750 | - | - | - | - | - | - | - | - |
$4,990 65,750 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $2,956 Cost: $965 |
$2,956 | 38,951 | - | - | - | - | - | - | - | - |
$2,956 38,951 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $302,173 Cost: $1,038,285 |
$178,225 | 2,348,163 | $4,505 | 300 | $513 | 38 | $18,930 | 3,977 | $100,000 | - | $178,225 2,348,163 kWh |
$4,505 300 kW-months/year |
$513 38 MMBtu |
$18,930 3,977 Tgal |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $181,798 Cost: $912,320 |
$57,850 | 762,186 | $4,505 | 300 | $513 | 38 | $18,930 | 3,977 | $100,000 | - | $57,850 762,186 kWh |
$4,505 300 kW-months/year |
$513 38 MMBtu |
$18,930 3,977 Tgal |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost |