IAC logo
IAC Assessment: TT0303
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0303
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2023
Principal Product Extruder Fibers for use in concrete reinforcement
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824 - Organic Fibers, Noncellulosic
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 1,000,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $394,070 7,575,496 kWh $0.05
Electricity Demand $230,657 17,532 kW-months/year $13.16
Natural Gas $7,145 499 MMBtu $14.32
TOTAL ENERGY COSTS $631,872
RECOMMENDED SAVINGS* $107,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$39,135
Cost:
-
- - - - $39,135 - -
-
kWh
-
-
MMBtu
$39,135
-
$
02: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$33,678
Cost:
$1,200
$33,678 647,400 - - - - $33,678
647,400
kWh
-
-
MMBtu
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$896
Cost:
$100
$896 17,231 - - - - $896
17,231
kWh
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,430
Cost:
$3,000
$11,430 219,715 - - - - $11,430
219,715
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,790
Cost:
$1,500
- - $1,790 125 - - -
-
kWh
$1,790
125
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,197
Cost:
$2,025
$2,197 42,239 - - - - $2,197
42,239
kWh
-
-
MMBtu
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$582
Cost:
$800
$582 11,190 - - - - $582
11,190
kWh
-
-
MMBtu
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,028
Cost:
$2,000
$1,028 19,757 - - - - $1,028
19,757
kWh
-
-
MMBtu
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$16,587
Cost:
$75,228
$16,587 318,866 - - - - $16,587
318,866
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$107,323
Cost:
$85,853
$66,398 1,276,398 $1,790 125 $39,135 - $66,398
1,276,398
kWh
$1,790
125
MMBtu
$39,135
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes