IAC logo
IAC Assessment: TT0311
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0311
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2024
Principal Product Ceramic Tiles
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3253 - Ceramic Wall And Floor Tile
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 530,000
Annual Production 45,830,677 Units
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,545,569 21,626,400 kWh $0.07
Electricity Demand $635,114 46,384 kW-months/year $13.69
Electricity Fees $(-274,707) - $ -
Natural Gas $1,712,608 389,642 MMBtu $4.40
TOTAL ENERGY COSTS $3,634,016
RECOMMENDED SAVINGS* $97,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$52,706
Cost:
$69,233
$41,749 583,907 $10,957 800 - - $41,749
583,907
kWh
$10,957
800
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,187
Cost:
$9,000
$20,187 282,334 - - - - $20,187
282,334
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,039
Cost:
$16,000
- - - - $10,039 2,282 -
-
kWh
-
-
kW-months/year
$10,039
2,282
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,957
Cost:
$30
$5,957 83,308 - - - - $5,957
83,308
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,792
Cost:
$3,400
$5,792 81,008 - - - - $5,792
81,008
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,298
Cost:
$1,735
$2,298 32,140 - - - - $2,298
32,140
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$510
Cost:
-
$510 7,132 - - - - $510
7,132
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$97,489
Cost:
$99,398
$76,493 1,069,829 $10,957 800 $10,039 2,282 $76,493
1,069,829
kWh
$10,957
800
kW-months/year
$10,039
2,282
MMBtu
TOTAL IMPLEMENTED Savings:
-