Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2024
Principal Product Flat rolled steel sheet & coil
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3316 - Cold Finishing Of Steel Shapes
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 513,633
Annual Production 1,500,000 Units
Production Hrs. Annual 4,160
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,126 2,292,732 kWh $0.05
Electricity Demand $39,594 11,005 kW-months/year $3.60
Natural Gas $29,122 2,276 MMBtu $12.80
LPG $16,884 869 MMBtu $19.43
TOTAL ENERGY COSTS $204,726
RECOMMENDED SAVINGS* $99,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$46,802
Cost:
$502,083
$46,802 900,032 - - - - - - - - - - $46,802
900,032
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$21,264
Cost:
$88,000
$(-768) (-14,773) - - - - $16,884 869 $5,148 - - - $(-768)
(-14,773)
kWh
-
-
kW-months/year
-
-
MMBtu
$16,884
869
MMBtu
$5,148
-
$
-
-
$
03: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$9,169
Cost:
-
$5,036 96,847 - - $4,133 323 - - - - - - $5,036
96,847
kWh
-
-
kW-months/year
$4,133
323
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,842
Cost:
-
- - - - - - - - - - $6,842 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$6,842
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,922
Cost:
$7,350
$5,922 113,885 - - - - - - - - - - $5,922
113,885
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,645
Cost:
$900
$4,645 89,259 - - - - - - - - - - $4,645
89,259
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,402
Cost:
$3,250
$4,402 84,667 - - - - - - - - - - $4,402
84,667
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$497
Cost:
$32
$454 8,726 $43 12 - - - - - - - - $454
8,726
kWh
$43
12
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$99,543
Cost:
$601,615
$66,493 1,278,643 $43 12 $4,133 323 $16,884 869 $5,148 - $6,842 - $66,493
1,278,643
kWh
$43
12
kW-months/year
$4,133
323
MMBtu
$16,884
869
MMBtu
$5,148
-
$
$6,842
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost One-time Revenue or Avoided Cost