Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2025
Principal Product Flat rolled metals processor- carbon steel, stainless steel, aluminum
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $100,000,000-$500,000,000
# of Employees 55
Plant Area (Sq.Ft.) 240,000
Annual Production 481,819 Tons
Production Hrs. Annual 4,250
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,246 1,261,200 kWh $0.15
Electricity Demand $107,350 4,468 kW-months/year $24.03
Electricity Fees $5,321 - $ -
Natural Gas $20,528 1,727 MMBtu $11.89
LPG $31,509 844 MMBtu $37.33
TOTAL ENERGY COSTS $362,227
RECOMMENDED SAVINGS* $66,066 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$473
Cost:
$60
$473 3,154 - - $473
3,154
kWh
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$16,071
Cost:
$15,000
- - $16,071 - -
-
kWh
$16,071
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$583
Cost:
$875
$583 3,885 - - $583
3,885
kWh
-
-
$
04: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$7,760
Cost:
$15,000
$7,760 46,664 - - $7,760
46,664
kWh
-
-
$
05: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$40,764
Cost:
$113,963
$40,764 271,762 - - $40,764
271,762
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$415
Cost:
$1,570
$415 2,700 - - $415
2,700
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$66,066
Cost:
$146,468
$49,995 328,165 $16,071 - $49,995
328,165
kWh
$16,071
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees