IAC logo
IAC Assessment: UA0028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2008
Principal Product Aircraft Parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 300
Plant Area (Sq.Ft.) 92,500
Annual Production 62,400 Pieces
Production Hrs. Annual 4,992
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $441,302 6,794,970 kWh $0.06
Natural Gas $132,969 8,709 MMBtu $15.27
TOTAL ENERGY COSTS $631,873
RECOMMENDED SAVINGS* $37,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,398
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,177
Cost:
$900
$2,177 33,516 - - $2,177
33,516
kWh
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,601
Cost:
$17,000
$3,601 55,440 - - $3,601
55,440
kWh
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,267
Cost:
-
$2,267 35,100 - - $2,267
35,100
kWh
-
-
MMBtu
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$131
Cost:
$111
$131 2,021 - - $131
2,021
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,703
Cost:
$475
- - $2,703 177 -
-
kWh
$2,703
177
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$23,591
Cost:
$34,365
$23,591 360,130 - - $23,591
360,130
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,651
Cost:
$1,500
$1,651 25,414 - - $1,651
25,414
kWh
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,006
Cost:
-
$1,006 15,486 - - $1,006
15,486
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$37,127
Cost:
$54,351
$34,424 527,107 $2,703 177 $34,424
527,107
kWh
$2,703
177
MMBtu
TOTAL IMPLEMENTED Savings:
$2,398
Cost:
$111
$2,398 37,121 - - $2,398
37,121
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas