IAC logo
IAC Assessment: UA0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2010
Principal Product polystyrene
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales <$500,000
# of Employees 59
Plant Area (Sq.Ft.) 350,000
Annual Production 330,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,165,771 21,419,405 kWh $0.05
Electricity Demand $509,736 34,181 kW-months/year $14.91
Natural Gas $338,457 31,466 MMBtu $10.76
Other Energy $445,183 66,692 MMBtu $6.68
TOTAL ENERGY COSTS $3,635,621
RECOMMENDED SAVINGS* $630,145 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,306
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$427,575
Cost:
$685,000
$332,542 5,999,308 $122,560 8,220 - - $228,077 58,500 - - $(-255,604) - $332,542
5,999,308
kWh
$122,560
8,220
kW-months/year
-
-
MMBtu
$228,077
58,500
MMBtu
-
-
Tgal
$(-255,604)
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,473
Cost:
-
$1,473 26,582 - - - - - - - - - - $1,473
26,582
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,635
Cost:
$740
$7,611 137,320 $3,024 203 - - - - - - - - $7,611
137,320
kWh
$3,024
203
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,938
Cost:
$75,000
$21,938 398,871 - - - - - - - - - - $21,938
398,871
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$12,306
Cost:
$8,325
$(-3,260) (-58,814) $(-2,002) (-134) - - - - $17,568 6,500,000 - - $(-3,260)
(-58,814)
kWh
$(-2,002)
(-134)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$17,568
6,500,000
Tgal
-
-
$
06: 2.2161 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS Savings:
$155,078
Cost:
$222,874
$(-27,531) (-496,657) $(-12,565) (-843) - - $195,174 50,019 - - - - $(-27,531)
(-496,657)
kWh
$(-12,565)
(-843)
kW-months/year
-
-
MMBtu
$195,174
50,019
MMBtu
-
-
Tgal
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,140
Cost:
$713
- - - - $1,140 106 - - - - - - -
-
kWh
-
-
kW-months/year
$1,140
106
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$630,145
Cost:
$992,652
$332,773 6,006,610 $111,017 7,446 $1,140 106 $423,251 108,519 $17,568 6,500,000 $(-255,604) - $332,773
6,006,610
kWh
$111,017
7,446
kW-months/year
$1,140
106
MMBtu
$423,251
108,519
MMBtu
$17,568
6,500,000
Tgal
$(-255,604)
-
$
TOTAL IMPLEMENTED Savings:
$12,306
Cost:
$8,325
$(-3,260) (-58,814) $(-2,002) (-134) - - - - $17,568 6,500,000 - - $(-3,260)
(-58,814)
kWh
$(-2,002)
(-134)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$17,568
6,500,000
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal One-time Revenue or Avoided Cost