IAC Assessment: UA0061
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0061
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2011
Principal Product automobiles
NAICS 336112 - Light Truck and Utility Vehicle Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales >$500,000,000
# of Employees 4,000
Plant Area (Sq.Ft.) 3,500,000
Annual Production 225,000 Pieces
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,920,000 200,000,000 kWh $0.07
Natural Gas $900,000 100,000 MMBtu $9.00
TOTAL ENERGY COSTS $14,820,000
RECOMMENDED SAVINGS* $1,149,286 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $223,288
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$223,288
Cost:
$22,500
$223,288 3,208,162 - - $223,288
3,208,162
kWh
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$224,396
Cost:
$387,720
$224,396 3,224,084 - - $224,396
3,224,084
kWh
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$27,256
Cost:
$85,000
$48,776 700,800 $(-21,520) (-2,391) $48,776
700,800
kWh
$(-21,520)
(-2,391)
MMBtu
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$98,700
Cost:
$112,800
- - $98,700 10,960 -
-
kWh
$98,700
10,960
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$164,422
Cost:
$19,809
$164,422 2,362,389 - - $164,422
2,362,389
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$411,224
Cost:
$71,550
$411,224 5,908,389 - - $411,224
5,908,389
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$1,149,286
Cost:
$699,379
$1,072,106 15,403,824 $77,180 8,569 $1,072,106
15,403,824
kWh
$77,180
8,569
MMBtu
TOTAL IMPLEMENTED Savings:
$223,288
Cost:
$22,500
$223,288 3,208,162 - - $223,288
3,208,162
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas