Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2012 |
Principal Product | brake lines and fuel lines |
NAICS | 332996 - Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3317 - Steel Pipe And Tubes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $149,594 | 2,554,894 | kWh | $0.06 |
Electricity Demand | $99,546 | 7,906 | kW-months/year | $12.59 |
Natural Gas | $57,337 | 5,073 | MMBtu | $11.30 |
TOTAL ENERGY COSTS | $306,477 | |||
RECOMMENDED SAVINGS* | $63,961 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,565 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $17,176 Cost: $2,039 |
- | - | - | - | - | - | $17,176 | 1,520 |
- - kWh |
- - kW-months/year |
- - $ |
$17,176 1,520 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $16,742 Cost: $3,900 |
$9,551 | 163,127 | $6,539 | 457 | $652 | - | - | - |
$9,551 163,127 kWh |
$6,539 457 kW-months/year |
$652 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $14,647 Cost: $80 |
$8,584 | 146,613 | $5,493 | 384 | $570 | - | - | - |
$8,584 146,613 kWh |
$5,493 384 kW-months/year |
$570 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $6,856 Cost: $7,937 |
$6,589 | 112,544 | - | - | $267 | - | - | - |
$6,589 112,544 kWh |
- - kW-months/year |
$267 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,851 Cost: $1,030 |
$1,779 | 30,382 | - | - | $72 | - | - | - |
$1,779 30,382 kWh |
- - kW-months/year |
$72 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT |
Savings: $3,939 Cost: $9,445 |
$364 | 6,211 | - | - | $15 | - | $3,560 | 252 |
$364 6,211 kWh |
- - kW-months/year |
$15 - $ |
$3,560 252 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $2,750 Cost: $415 |
$1,592 | 27,186 | - | - | $107 | - | $1,051 | 93 |
$1,592 27,186 kWh |
- - kW-months/year |
$107 - $ |
$1,051 93 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,961 Cost: $24,846 |
$28,459 | 486,063 | $12,032 | 841 | $1,683 | - | $21,787 | 1,865 | $28,459 486,063 kWh |
$12,032 841 kW-months/year |
$1,683 - $ |
$21,787 1,865 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,565 Cost: $6,019 |
$18,135 | 309,740 | $12,032 | 841 | $1,222 | - | $17,176 | 1,520 | $18,135 309,740 kWh |
$12,032 841 kW-months/year |
$1,222 - $ |
$17,176 1,520 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |