Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2012 |
Principal Product | Paper printing and packaging |
NAICS | 322121 - Paper (except Newsprint) Mills |
SIC | 2621 - Paper Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 174,000 |
Annual Production | 900,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $276,790 | 3,479,521 | kWh | $0.08 |
Natural Gas | $28,263 | 2,304 | MMBtu | $12.27 |
TOTAL ENERGY COSTS | $305,053 | |||
RECOMMENDED SAVINGS* | $39,346 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,706 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,801 Cost: $2,400 |
$3,536 | 44,400 | $265 | - | - | - |
$3,536 44,400 kWh |
$265 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,710 Cost: $800 |
$8,102 | 100,145 | $608 | - | - | - |
$8,102 100,145 kWh |
$608 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $7,097 Cost: $2,040 |
$3,648 | 45,599 | $274 | - | $3,175 | 259 |
$3,648 45,599 kWh |
$274 - $ |
$3,175 259 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,398 Cost: $2,039 |
- | - | - | - | $1,398 | 114 |
- - kWh |
- - $ |
$1,398 114 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $362 Cost: $84 |
$337 | 4,007 | $25 | - | - | - |
$337 4,007 kWh |
$25 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $808 Cost: $398 |
$752 | 9,403 | $56 | - | - | - |
$752 9,403 kWh |
$56 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $16,122 Cost: $8,865 |
- | - | - | - | $16,122 | 1,315 |
- - kWh |
- - $ |
$16,122 1,315 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $1,048 Cost: $930 |
$975 | 12,195 | $73 | - | - | - |
$975 12,195 kWh |
$73 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,346 Cost: $17,556 |
$17,350 | 215,749 | $1,301 | - | $20,695 | 1,688 | $17,350 215,749 kWh |
$1,301 - $ |
$20,695 1,688 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,706 Cost: $4,838 |
$7,936 | 99,402 | $595 | - | $3,175 | 259 | $7,936 99,402 kWh |
$595 - $ |
$3,175 259 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas |