IAC Assessment: UA0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2012
Principal Product Pumps and motors
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 263,000
Annual Production 50,000 Pieces
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $619,949 14,519,736 kWh $0.04
Electricity Demand $121,301 32,769 kW-months/year $3.70
Electricity Fees $187,100 - $ -
Natural Gas $59,212 7,640 MMBtu $7.75
TOTAL ENERGY COSTS $1,004,237
RECOMMENDED SAVINGS* $72,847 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,231
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ %
01: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$57,749
Cost:
$240,000
$41,055 961,465 - - $8,273 - $(-71,579) (-9,236) $80,000 - $41,055
961,465
kWh
-
-
kW-months/year
$8,273
-
$
$(-71,579)
(-9,236)
MMBtu
$80,000
-
%
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,836
Cost:
$1,500
- - - - $101 - $6,735 869 - - -
-
kWh
-
-
kW-months/year
$101
-
$
$6,735
869
MMBtu
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,031
Cost:
$6,195
$3,743 87,666 $444 120 $844 - - - - - $3,743
87,666
kWh
$444
120
kW-months/year
$844
-
$
-
-
MMBtu
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,119
Cost:
$480
$2,267 53,097 $329 89 $523 - - - - - $2,267
53,097
kWh
$329
89
kW-months/year
$523
-
$
-
-
MMBtu
-
-
%
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$112
Cost:
$106
$83 1,939 $10 3 $19 - - - - - $83
1,939
kWh
$10
3
kW-months/year
$19
-
$
-
-
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$72,847
Cost:
$248,281
$47,148 1,104,167 $783 212 $9,760 - $(-64,844) (-8,367) $80,000 - $47,148
1,104,167
kWh
$783
212
kW-months/year
$9,760
-
$
$(-64,844)
(-8,367)
MMBtu
$80,000
-
%
TOTAL IMPLEMENTED Savings:
$3,231
Cost:
$586
$2,350 55,036 $339 92 $542 - - - - - $2,350
55,036
kWh
$339
92
kW-months/year
$542
-
$
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Increase in Production