IAC logo
IAC Assessment: UA0098
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0098
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2013
Principal Product Tires
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales $100,000,000-$500,000,000
# of Employees 1,750
Plant Area (Sq.Ft.) 1,515,000
Annual Production 4,200,000 Pieces
Production Hrs. Annual 8,600
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,000,000 163,934,426 kWh $0.06
Electricity Demand $828,144 194,400 kW-months/year $4.26
TOTAL ENERGY COSTS $10,828,144
RECOMMENDED SAVINGS* $218,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $132,802
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$55,414
Cost:
$35,390
$45,032 738,223 $10,382 2,437 $45,032
738,223
kWh
$10,382
2,437
kW-months/year
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$51,977
Cost:
$20,000
$47,754 782,845 $4,223 991 $47,754
782,845
kWh
$4,223
991
kW-months/year
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$25,411
Cost:
$3,500
$25,207 413,226 $204 48 $25,207
413,226
kWh
$204
48
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$69,733
Cost:
$36,138
$69,733 1,143,160 - - $69,733
1,143,160
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,024
Cost:
$34,540
$7,024 115,150 - - $7,024
115,150
kWh
-
-
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,139
Cost:
$22,860
$9,139 149,824 - - $9,139
149,824
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$218,698
Cost:
$152,428
$203,889 3,342,428 $14,809 3,476 $203,889
3,342,428
kWh
$14,809
3,476
kW-months/year
TOTAL IMPLEMENTED Savings:
$132,802
Cost:
$58,890
$117,993 1,934,294 $14,809 3,476 $117,993
1,934,294
kWh
$14,809
3,476
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand