Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2013 |
Principal Product | Steel bars |
NAICS | 331110 - Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312 - Blast Furnaces And Steel Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 542,000 |
Annual Production | 420,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $12,500,000 | 208,333,333 | kWh | $0.06 |
Natural Gas | $2,247,561 | 458,686 | MMBtu | $4.90 |
TOTAL ENERGY COSTS | $14,747,561 | |||
RECOMMENDED SAVINGS* | $156,809 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $28,561 Cost: $600 |
$28,561 | 476,020 | - | - |
$28,561 476,020 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $58,770 Cost: $91,630 |
$58,770 | 979,495 | - | - |
$58,770 979,495 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $51,514 Cost: $100,000 |
- | - | $51,514 | 10,513 |
- - kWh |
$51,514 10,513 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $17,964 Cost: $9,249 |
- | - | $17,964 | 3,666 |
- - kWh |
$17,964 3,666 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $156,809 Cost: $201,479 |
$87,331 | 1,455,515 | $69,478 | 14,179 | $87,331 1,455,515 kWh |
$69,478 14,179 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - - kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||