Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2013 |
Principal Product | Polystyrene containers |
NAICS | 326140 - Polystyrene Foam Product Manufacturing |
SIC | 3086 - Plastics Foam Products |
Sales | $5,000,000-$10,000,000 |
# of Employees | 385 |
Plant Area (Sq.Ft.) | 23,000 |
Annual Production | 84,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,471,101 | 69,754,208 | kWh | $0.04 |
Electricity Demand | $530,542 | 69,167 | kW-months/year | $7.67 |
Electricity Fees | $923,396 | - | $ | - |
TOTAL ENERGY COSTS | $3,925,039 | |||
RECOMMENDED SAVINGS* | $53,740 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $53,740 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $6,225 Cost: $851 |
$4,786 | 135,220 | - | - | $1,439 | - |
$4,786 135,220 kWh |
- - kW-months/year |
$1,439 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $42,878 Cost: $2,530 |
$32,070 | 905,947 | $895 | 117 | $9,913 | - |
$32,070 905,947 kWh |
$895 117 kW-months/year |
$9,913 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,637 Cost: $100 |
$2,589 | 73,739 | $976 | 127 | $1,072 | - |
$2,589 73,739 kWh |
$976 127 kW-months/year |
$1,072 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,740 Cost: $3,481 |
$39,445 | 1,114,906 | $1,871 | 244 | $12,424 | - | $39,445 1,114,906 kWh |
$1,871 244 kW-months/year |
$12,424 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $53,740 Cost: $3,481 |
$39,445 | 1,114,906 | $1,871 | 244 | $12,424 | - | $39,445 1,114,906 kWh |
$1,871 244 kW-months/year |
$12,424 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees |