Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2014 |
Principal Product | Automotive Electro Coating |
NAICS | 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479 - Metal Coating And Allied Services |
Sales | $100,000,000-$500,000,000 |
# of Employees | 62 |
Plant Area (Sq.Ft.) | 102,000 |
Annual Production | 30,154 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $228,708 | 5,045,100 | kWh | $0.05 |
Electricity Demand | $39,800 | 9,478 | kW-months/year | $4.20 |
Electricity Fees | $104,602 | - | $ | - |
Natural Gas | $195,110 | 37,574 | MMBtu | $5.19 |
TOTAL ENERGY COSTS | $568,220 | |||
RECOMMENDED SAVINGS* | $43,004 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,930 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $15,715 Cost: $35,154 |
- | - | - | - | - | - | $15,715 | 3,028 |
- - kWh |
- - kW-months/year |
- - $ |
$15,715 3,028 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $11,506 Cost: $6,410 |
- | - | - | - | - | - | $11,506 | 2,217 |
- - kWh |
- - kW-months/year |
- - $ |
$11,506 2,217 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,774 Cost: $200 |
$1,718 | 37,889 | - | - | $667 | - | $389 | 75 |
$1,718 37,889 kWh |
- - kW-months/year |
$667 - $ |
$389 75 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,266 Cost: - |
$(-1,230) | (-27,125) | - | - | - | - | $2,496 | 481 |
$(-1,230) (-27,125) kWh |
- - kW-months/year |
- - $ |
$2,496 481 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $6,867 Cost: $4,120 |
- | - | $4,947 | 1,178 | $1,920 | - | - | - |
- - kWh |
$4,947 1,178 kW-months/year |
$1,920 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,986 Cost: $2,522 |
$2,068 | 45,627 | $83 | 20 | $835 | - | - | - |
$2,068 45,627 kWh |
$83 20 kW-months/year |
$835 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,890 Cost: $100 |
$1,351 | 29,804 | $11 | 2 | $528 | - | - | - |
$1,351 29,804 kWh |
$11 2 kW-months/year |
$528 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,004 Cost: $48,506 |
$3,907 | 86,195 | $5,041 | 1,200 | $3,950 | - | $30,106 | 5,801 | $3,907 86,195 kWh |
$5,041 1,200 kW-months/year |
$3,950 - $ |
$30,106 5,801 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,930 Cost: $300 |
$1,839 | 40,568 | $11 | 2 | $1,195 | - | $2,885 | 556 | $1,839 40,568 kWh |
$11 2 kW-months/year |
$1,195 - $ |
$2,885 556 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |