Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2019 |
Principal Product | Turbine Blade Coatings |
NAICS | 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479 - Metal Coating And Allied Services |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 6,500 Units |
Production Hrs. Annual | 7,500 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $226,269 | 3,661,200 | kWh | $0.06 |
Electricity Demand | $114,841 | 8,907 | kW-months/year | $12.89 |
Electricity Fees | $18,100 | - | $ | - |
Natural Gas | $303,385 | 35,616 | MMBtu | $8.52 |
TOTAL ENERGY COSTS | $662,595 | |||
RECOMMENDED SAVINGS* | $56,176 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,851 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $4,041 Cost: $3,585 |
$4,172 | 67,500 | $1,857 | 144 | $320 | - | $(-2,308) | (-271) | - | - |
$4,172 67,500 kWh |
$1,857 144 kW-months/year |
$320 - $ |
$(-2,308) (-271) MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,933 Cost: $50 |
$1,230 | 19,896 | $606 | 47 | $97 | - | - | - | - | - |
$1,230 19,896 kWh |
$606 47 kW-months/year |
$97 - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,910 Cost: $1,395 |
$1,989 | 32,192 | $774 | 60 | $147 | - | - | - | - | - |
$1,989 32,192 kWh |
$774 60 kW-months/year |
$147 - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $36,500 Cost: $104,362 |
- | - | - | - | - | - | - | - | $36,500 | 365 |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$36,500 365 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $856 Cost: $922 |
$813 | 13,162 | - | - | $43 | - | - | - | - | - |
$813 13,162 kWh |
- - kW-months/year |
$43 - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $5,941 Cost: $50 |
$5,641 | 91,277 | - | - | $300 | - | - | - | - | - |
$5,641 91,277 kWh |
- - kW-months/year |
$300 - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,995 Cost: $3,320 |
- | - | - | - | - | - | $3,995 | 469 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$3,995 469 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,176 Cost: $113,684 |
$13,845 | 224,027 | $3,237 | 251 | $907 | - | $1,687 | 198 | $36,500 | 365 | $13,845 224,027 kWh |
$3,237 251 kW-months/year |
$907 - $ |
$1,687 198 MMBtu |
$36,500 365 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,851 Cost: $1,445 |
$7,630 | 123,469 | $774 | 60 | $447 | - | - | - | - | - | $7,630 123,469 kWh |
$774 60 kW-months/year |
$447 - $ |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Liquid (non-haz) |